Orange County NC Website
e HCDOT 1.3 ASPHALT �1dT�1 4A?Ws <br />3" N1�YPOET HNDER" I� <br />€ <br />€ <br />-1 I Af AXIMU <br />�4" 1' IA 1/4" / ' MAXIMUM <br />_ Ai- n MAXIMUM <br />COMPACTED SUBGRADE 6i <br />R <br />� e- <br />:dvm Z <br />v�.frnlG� Cb�Jnsi �/ <br />NOTES: <br />A? `� t L, 1.. 1. CONSTRUCTION PROCEDURES AND MATERIAL SHALL CONFORM TO NORTH CAROLINA <br />DEPARTMENT OF TRANSPORTATION (NCDOT) STANDARD SPECIFICATION FOR ROAD AND <br />STRUCTURES. <br />2. 2. <br />• EXISTING PAVEMENT AND OTHER SURFACES WHICH HAS BEEN DISTURBED BY THE <br />CONTRACTOR SHALL BE REPAIRED TO LIKE -NEW CONDITION <br />3. THE CONTRACTOR SHALL ENSURE ALL GRADING AND LAND O►STURBANCE ACTIVITIES ARE <br />PERFORM l TO KEEP POSITIVE DRAINAGE TO THE EROSION CONTROL FEATURES. <br />t4v-r' TO SCRL6 <br />