Browse
Search
Viper Analysis Report - 11-17-2011 - 1 - Attachment 2
OrangeCountyNC
>
BOCC Archives
>
Reports
>
Viper Analysis Report - 11-17-2011 - 1 - Attachment 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2013 2:38:35 PM
Creation date
1/3/2012 10:19:37 AM
Metadata
Fields
Template:
BOCC
Date
11/17/2011
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
1- Attachment 2
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CTA Communications <br />Orange RaCE Test Report <br />A.3 Pre -Test Procedures <br />Before commencing testing each day, the following procedures were executed: <br />1. Initiate the RaCE self diagnostic tests to assure that the system continues to operate <br />correctly. <br />2. Verify that the attenuation is correctly established for the testing to be conducted <br />during the day. <br />AA Conclusion of each Day of Testing <br />At the conclusion of testing each day, the following procedures were executed: <br />1. Extract data from the mobile and stationary computers. <br />Run the post - processing software. <br />2. Verify that the extracted data is acceptably correlated and merged. <br />3. Preserve the extracted data on a CD -ROM or other external storage media. <br />A.5 Prolonged Interruptions <br />Before testing resumes after a prolonged (greater than 4 hours) interruption, the following <br />procedures are executed: <br />1. Perform the daily self - diagnostic test — take corrective action(s) as needed. <br />2. Verify attenuation settings and other equipment settings. <br />A.6 Conclusion of Final Testing <br />At the conclusion of the final testing session, the following procedures were executed: <br />1. Extracted and preserved all test data. <br />2. Packed and shipped the equipment back to Lynchburg. <br />-25- N MPa! I � ECO <br />
The URL can be used to link to this page
Your browser does not support the video tag.