Orange County NC Website
C un%cations <br />Orange RaCE Test Report <br />A.3 Pre-Test Procedures <br />Before commencing testing each day, the following procedures were executed: <br />1. Initiate the RaCE self diagnostic tests to assure that the system continues to operate <br />correctly. <br />2. Verify that the attenuation is correctly established for the testing to be conducted <br />during the day. <br />A.4 Conclusion of each Day of Testing <br />At the conclusion of testing each day, the following procedures were executed: <br />1. Extract data from the mobile and stationary computers. <br />Run the post-processing software. <br />2. Verify that the extracted data is acceptably correlated and merged. <br />3. Preserve the extracted data on a CD-ROM or other external storage media. <br />A.5 Prolonged Interruptions <br />Before testing resumes after a prolonged (greater than 4 hours) interruption, the following <br />procedures are executed: <br />1. Perform the daily self-diagnostic test -take corrective action(s) as needed. <br />2. Verify attenuation settings and other equipment settings. <br />A.6 Conclusion of Final Testing. <br />At the conclusion of the final testing session, the following procedures were executed: <br />1. Extracted and preserved all test data. <br />2. Packed and shipped the equipment back to Lynchburg. <br />i <br />