Orange County NC Website
CTA Comuniicatiions <br />Orange RaCE Test Report <br />Appendix A Setup Procedures <br />A.1 Pre-Ship Procedures <br />Before departing Lynchburg, the following procedures were executed: <br />1. Install current and approved version of the RaCE software. <br />2. Set and verify audio levels from the Orange County provided radios under test. <br />3. Install RaCE hardware and verify radio operation. <br />4. Calibrate RaCE RSSI receivers using the following procedures: <br />• With the computer connected to the RSSI. receiver to be checked, start the RaCE <br />subroutine that allows the monitoring of the digital RSSI output of the receiver. <br />• Connect the signal generator to the receiver/pre-amplifier combination. <br />• Set the signal generator to a frequency near the mid point of the band to be <br />calibrated and set the software to program the radio to the same frequency. <br />• Adjust the output level to the point where the RSSI count just reaches 255 and <br />note the level in dBm. <br />• Decrease the output in 1 dB steps and record the RSSI value for each step until <br />the RSSI indication becomes 000. <br />• Enter the results into the RaCE calibration table for the receiver. <br />5. Complete Loss Calculation table and select attenuation level for portable mounted at <br />the hip simulation. <br />Perform RaCE system bench testing and verification. <br />6. Install stationary and mobile RaCE and verify system operation in a talk around mode <br />using assigned VHF frequencies. <br />7. Extract data from mobile and stationary units and verify correlation routines work and <br />that the data is acceptable. <br />A.2 Post-Ship. Procedures <br />On arrival at the testing site, the following procedures were executed: <br />1. Mobile Unit -Reproduce the mobile configuration established above. <br />2. Verify the Mobile Unit frequencies to be tested are correctly input into RaCE. <br />3. Stationary Unit -reproduce the stationary configuration established above. <br />4. Verify the Stationary Unit test frequencies are correctly input into RaCE. <br /> <br />