Orange County NC Website
0 Sri, <br /> 1T 5. <br /> SCHEDULE OF <br /> Cas°``ro <br /> PER DIEM AND EXPENSE RATE SCHEDULES <br /> The following tables summarize Olver's labor and direct expense rates for Fiscal Year 2011-12. The <br /> hourly per diem rates include all direct labor, overhead, and profit costs. <br /> Per Diem Labor <br /> Labor Classification Rate($/hour) <br /> Project Manager $ 145 <br /> Senior Engineer/Planner $ 130 <br /> Environmental Engineer $ 105 <br /> Project Engineer $ 85 <br /> CADD/Technician $ 65 <br /> Clerical $ 45 <br /> Direct expenses would be billed on a direct reimbursement basis in accordance with the following <br /> schedule: <br /> Direct Expenses <br /> Category Billing Rate <br /> Reproduction and Mailing At Cost <br /> Printing At Cost <br /> Travel At Cost <br /> Mileage 7-io. per mile <br /> 0II+"_ LANDFitI <br /> CUM PCOWOPATM MAY 18,2011 <br />