Orange County NC Website
§16.4 Owner Default.Failure of the Owner,which has not been remedied or waived,to pay the Contractor as required under the Construction <br /> Contract or to perform and complete or comply with the other material terms of the Construction Contract. <br /> §16.5 Contract Documents.All the documents that comprise the agreement between the Owner and Contractor. <br /> §17 If this Bond is issued for an agreement between a Contractor and subcontractor,the term Contractor in this Bond shall be deemed to be <br /> Subcontractor and the term Owner shall be deemed to be Contractor. <br /> §18 Modifications to this bond are as follows: <br /> (Space is provided'below for additional signatures of added parties,other than those appearing on the cover page.) <br /> CONTRACTOR AS PRINCIPAL SURETY <br /> Company: (Corporate Seal) Company: 'Corporate Seal) <br /> Warren Hay Mechanical C ntractors Ohio Cas4"Y "lI nce Company <br /> r <br /> Si afore: - - — Signature _ <br /> N e and 'le: ar .Warren, President Name and m ie ,Attorney-in-act <br /> A dress Address <br /> 8 <br />