Browse
Search
2011-312 AMS - Warren Hay Mechanical Contractors for Geothermal HVAC Installation at Link Building
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2011
>
2011-312 AMS - Warren Hay Mechanical Contractors for Geothermal HVAC Installation at Link Building
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2018 10:00:37 AM
Creation date
12/29/2011 10:52:35 AM
Metadata
Fields
Template:
Contract
Date
9/19/2011
Contract Starting Date
9/19/2011
Contract Ending Date
3/31/2012
Contract Document Type
Agreement - Construction
Agenda Item
8c
Amount
$679,326.00
Document Relationships
Agenda - 09-08-2011 - 8c
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2011\Agenda - 09-08-2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 The Surety shall not be liable to the Owner,Claimants or others for obligations of the Contractor that are unrelated to the Construction <br /> Contract.The Owner shall not be liable for the payment of any costs or expenses of any Claimant under this Bond,and shall have under this <br /> Bond no obligation to make payments to,or give notice on behalf of,Claimants or otherwise have any obligations to Claimants under this <br /> Bond. <br /> § 11 The Surety hereby waives notice of any change,including changes of time,to the Construction Contract or to related subcontracts, <br /> purchase orders and other obligations. <br /> § 12 No suit or action shall be commenced by a Claimant under this Bond other than in a court of competent jurisdiction in the state in which <br /> the project that is the subject of the Construction Contract is located or after the expiration of one year from the date(1)on which the Claimant <br /> sent a Claim to the Surety pursuant to Section 5.1.2 or 5.2,or(2)on which the last labor or service was performed by anyone or the last <br /> materials or equipment were furnished by anyone under the Construction Contract,whichever of(1)or(2)first occurs.If the provisions of this <br /> Paragraph are void or prohibited by law,the minimum period of limitation available to sureties as a defense in the jurisdiction of the suit shall <br /> be applicable. <br /> § 13 Notice and Claims to the Surety,the Owner or the Contractor shall be mailed or delivered to the address shown on the page on which their <br /> signature appears.Actual receipt of notice or Claims,however accomplished,shall be sufficient compliance as of the date received. <br /> 3 14 When this Bond has been furnished to comply with a statutory or other legal requirement in the location where the construction was to be <br /> performed,any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions <br /> conforming to such statutory or other legal requirement shall be deemed incorporated herein.When so furnished,the intent is that this Bond <br /> shall be construed as a statutory bond and not as a common law bond. <br /> § 15 Upon request by any person or entity appearing to be a potential beneficiary of this Bond,the Contractor and Owner shall promptly furnish <br /> a copy of this Bond or shall permit a copy to be made. <br /> 16 Definitions <br /> § 16.1 Claim. A written statement by the Claimant including at a minimum: <br /> .1 the name of the Claimant; <br /> .2 the name of the person for whom the labor was done,or materials or equipment furnished; <br /> .3 a copy of the agreement or purchase order pursuant to which labor,materials or equipment was furnished for use in the <br /> performance of the Construction Contract; <br /> .4 a brief description of the labor,materials or equipment furnished; <br /> .5 the date on which the Claimant last performed labor or last furnished materials or equipment for use in the performance of the <br /> Construction Contract; <br /> .6 the total amount earned by the Claimant for labor,materials or equipment furnished as of the date of the Claim; <br /> .7 the total amount of previous payments received by the Claimant;and <br /> .8 the total amount due and unpaid to the Claimant for labor,materials or equipment furnished as of the date of the Claim. <br /> 16.2 Claimant. An individual or entity having a direct contract with the Contractor or with a subcontractor of the Contractor to furnish labor, <br /> materials or equipment for use in the performance of the Construction Contract. The term Claimant also includes any individual or entity that <br /> has rightfully asserted a claim under an applicable mechanics's lien or similar statute against the real property upon which the Project is <br /> located. The intent of this Bond shall be to include without limitation in the terms"labor,materials or equipment"that part of water,gas, <br /> power,light,heat,oil,gasoline,telephone service or rental equipment used in the Construction Contract,architectural and engineering services <br /> required for performance of the work of the Contractor and the Contractor's subcontractors,and all other items for which a mechanic's lien may <br /> be asserted in the jurisdiction where the labor,materials or equipment were furnished. <br /> § 16.3 Construction Contract. The agreement between the Owner and Contractor identified on the cover page,including all Contract <br /> Documents and all changes made to the agreement and the Contract Documents. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.