Browse
Search
2011-312 AMS - Warren Hay Mechanical Contractors for Geothermal HVAC Installation at Link Building
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2011
>
2011-312 AMS - Warren Hay Mechanical Contractors for Geothermal HVAC Installation at Link Building
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2018 10:00:37 AM
Creation date
12/29/2011 10:52:35 AM
Metadata
Fields
Template:
Contract
Date
9/19/2011
Contract Starting Date
9/19/2011
Contract Ending Date
3/31/2012
Contract Document Type
Agreement - Construction
Agenda Item
8c
Amount
$679,326.00
Document Relationships
Agenda - 09-08-2011 - 8c
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2011\Agenda - 09-08-2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
[Departmental Use Only] <br /> TITLE #30035 Link <br /> Geothermal Install <br /> FY FY2011-12 <br /> NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT UNDER$1,000,000.00 <br /> ORANGE COUNTY <br /> THIS CONSTRUCTION AGREEMENT (hereinafter called "Agreement"), made as of the 19th <br /> day of September, 2011, by and between Warren Hay Mechanical Contractors, (hereinafter called the <br /> "Contractor"), and Orange County, a body politic and a political subdivision of the State of North <br /> Carolina, (hereinafter called the "Owner"). <br /> WITNESSETH: <br /> That the Contractor and the Owner, for the consideration herein named, agree as follows: <br /> 1. CONTRACT DOCUMENTS; PRIORITY <br /> The Contract Documents consist of this Agreement, the Request for Proposals, Proposal, <br /> Construction Drawings and Written Specifications. The Contract Documents form the Contract and are <br /> fully incorporated herein. In the event of any inconsistency between or among the Contract Documents <br /> the Contract Documents shall be interpreted in the following order of priority: <br /> a. This Agreement. <br /> b. Designer Approved Bulletins and/or Field Orders. <br /> c. Request for Proposals and addenda thereto. <br /> d. Proposal. <br /> 2. SCOPE OF WORK <br /> The Contractor shall furnish and deliver all of the materials, and perform all of the work <br /> required by this Agreement within the time period stipulated in a written Notice-to-Proceed to be <br /> executed by the Contractor and Owner and in accordance with the following enumerated documents, <br /> which are made a part hereof as if fully contained herein: <br /> a. Construction Drawings prepared by Reece, Noland & McElrath, Inc. (Sheet set including <br /> CO.1, MO.1, M1.1, M1.2, M2.1, M3.1, M4.1, M5.1, M5.2, ELI, E2.1, E3.1 dated <br /> 6/24/2011) <br /> b. Written specifications prepared by the project engineer. <br /> c. Bid proposal dated June 27, 2011 which fully describes the work to be performed, such <br /> work(hereinafter called the"Work"). <br /> d. Related documents listed under Section 1 above. <br /> Revised December 2010 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.