Browse
Search
2011-357 AMS - H. M. Kern Corp. - Change Order #9 Revised for Health Dept. Renovations at Whitted Bldg.
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2011
>
2011-357 AMS - H. M. Kern Corp. - Change Order #9 Revised for Health Dept. Renovations at Whitted Bldg.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2016 3:53:59 PM
Creation date
12/28/2011 1:31:54 PM
Metadata
Fields
Template:
BOCC
Date
12/8/2011
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Manager signed
Document Relationships
Agenda - 02-15-2011 - 4m
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2011\Agenda - 02-15-2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUALITY ELECTRIC CO,, INC <br /> COMMERCIAL•INDUSTRIAL•RESIDENTIAL WIRING <br /> TELEPHONE: 919-596-8113 FAX: 919-596-8114 <br /> 3033 WAKE FOREST HWY <br /> DURHAM,NORTH CAROLINA 27703 <br /> September 29th 2011 <br /> H.M.Kern Corp. <br /> Pete Upchurch <br /> OCHD <br /> Revision 1 OCHD Elevator fire alarm upgrade for passage elevator only. <br /> 2—Module relays w/base 125.00 <br /> 1 — FA-70 AMP SQ—D w/shunt trip 690.00 <br /> 150' Y4"conduit emt w/fittings 120.00 <br /> 6—4"sq box 28.50 <br /> 120' #12 THHN 23.40 <br /> 250' Fire Alarm cable 16/2 92.00 <br /> 30' %"Flexible conduit w/fitting 43.30 <br /> 4—Double gang bell box 76.00 <br /> Lot—strapping&mounting 25.00 <br /> 1223.20 <br /> Tax 94.80 <br /> 1318.00 <br /> Mark Up 197.70 <br /> 151 5.70 <br /> Labor 40 man hours @ 45.00 per 1800.00 <br /> Total 3315.70 <br /> Sub-Contractor <br /> BFPE Fire&Safety Labor for design Drawing 195.00 <br /> 2—smoke detectors 2—heat detectors - <br /> 2--relay modules 420.00 <br /> Sub-Contractor mark-up 7.5% 46.13 <br /> 661.13 <br /> Proposal Total $ 3,976.83 <br /> Note: The existing Elevator has not been checked by elevator contractor for compatibility with new equipment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.