Orange County NC Website
H.M.Kern Corporation PCO-26 9115/2011 <br /> Job 9 759 ORANGE COUNTY HEALTH DEPARTMENT RENOVATIONS <br /> REPLACE BROKEN STORM DRAIN GRATING AND 668-3213(p <br /> CONCRETE FLUME 688-2142(f) <br /> Phase Descri lion Qtv unit ya!q Amount <br /> Labor: <br /> 20110 COORDINATION 4 HR 22.00 88 <br /> 20210 REMOVE CONCRETE 4 HR 22.00 88 <br /> 20300 FORM FLUME 4 HR 22.00 88 <br /> 20300 PLACE AND FINISH CONCRETE 6 HR 22.00 132 <br /> 0 0.00 0 <br /> 0 0.00 0 <br /> 0 0.00 0 <br /> 0 0.00 0 <br /> 0 0.00 0 <br /> Total Labor 396 <br /> Materials: <br /> 30300 CONCRETE 2 CY 105.00 210 <br /> 30250 CAST IRON GRATE 1 EA 85.00 85 <br /> 0 0.00 0 <br /> 0 0.00 0 <br /> 0 0.00 0 <br /> 0 0.00 0 <br /> 0 0.00 0 <br /> 0 0.00 0 <br /> 0 0.00 0 <br /> Total Materials 295 <br /> Equipment: <br /> 10154 SKID STEER 1 DY 156.00 156 <br /> 0 0.00 0 <br /> 0 0.00 0 <br /> 0 0.00 0 <br /> 0 0.00 0 <br /> 0 0.00 0 <br /> Total Equipment 156 <br /> Subcontractors: <br /> 0 0.00 0 <br /> 0 0.00 0 <br /> 0 0.00 0 <br /> 0 0.00 0 <br /> 0 0.00 0 <br /> 0 0.00 0 <br /> Total Subcontractors 0 <br /> Total Labor, Materials &Equipment 847 <br /> Sales Tax(Materials& Equipment) 7.75% 35 <br /> 29160 Labor Burden 40% 158 <br /> Subtotal 1,040 <br /> 89800 OH &Profit(Labor, Materials& Equipment) 20% 208 <br /> Total Subcontractors 0 <br /> 89800 OH& Profit(Subcontractors) 10% 0 <br /> Subtotal 1,248 <br /> 62050 Performance&Payment Bond o ?.+(i• 30 <br /> Total Proposed Change Order $1,278 <br /> Page 1 <br />