Browse
Search
2011-320 AMS - H. M. Kern Corp. - Change Order #8 for Health Dept. renovations at Whitted Bldg.
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2011
>
2011-320 AMS - H. M. Kern Corp. - Change Order #8 for Health Dept. renovations at Whitted Bldg.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 2:49:01 PM
Creation date
12/28/2011 1:22:51 PM
Metadata
Fields
Template:
BOCC
Date
2/15/2011
Meeting Type
Work Session
Document Type
Contract
Agenda Item
4m Mgr S
Document Relationships
Agenda - 02-15-2011 - 4m
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2011\Agenda - 02-15-2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comfort Engineers, Inc.-Mechanical Contractors <br /> P.O. Box 2955, Durham, North Carolina 27715-2955 <br /> Construction Group <br /> 4008 Comfort Lane, Durham, North Carolina 27705 <br /> (919)383-2502 FAX (919)383-2507 <br /> Residential &Commercial Service Groups <br /> (91 j Comfort Lane, Durham, North Carolina 27705 <br /> ENGINEERS <br /> 919 383-0158 FAX 919)309-0212 <br /> August 16, 2011 <br /> Mr. Peter Upchurch <br /> HM Kern Corporation <br /> PO Box 19424 <br /> Greensboro, NC 27419 <br /> Re: Orange County Health Department <br /> Elevator Machine Room Transfer Duct Proposal <br /> Proposal to add a transfer duct from the elevator machine room ceiling to the corridor <br /> out side the room. Duct to have a fire damper at the machine room wall, and diffusers <br /> in the ceiling of the machine room, and the adjacent corridor. This is to occur at the <br /> passenger, and freight elevator equipment room. Materials and labor for both rooms <br /> are included. <br /> Materials <br /> Fire Dampers/Grilles/Access Door $397.00 <br /> Sheet Metal Material $400.00 <br /> Tax: $54.00 <br /> Subtotal: $851.00 <br /> Labor <br /> Sheet metal $648.00 <br /> TOTAL: $1499.00 <br /> If there are any questions, please contact me. <br /> Sincerely, <br /> Curtis Turman <br /> Project Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.