Browse
Search
2011-362 Planning - Terracon Consultants, Inc. for Buckhorn Efland Phase 2 Sanitary Sewer Construction Materials Testing
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2011
>
2011-362 Planning - Terracon Consultants, Inc. for Buckhorn Efland Phase 2 Sanitary Sewer Construction Materials Testing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2016 11:29:41 AM
Creation date
12/14/2011 12:00:38 PM
Metadata
Fields
Template:
BOCC
Date
6/21/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5n - Manager Signed
Document Relationships
Agenda - 06-21-2011 - 5n
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2011\Agenda - 06-21-2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> ' <br /> | <br /> COST ESTIMATE <br /> Construction Materials Testing Services <br /> Central Efland I Northern Buckhorn Sewer Extension <br /> Orange County, NC <br /> Terracon Proposal No.P70110416 <br /> SERVICES RATES TOTAL <br /> Field and Laboratory Services <br /> Structural Fill and Utility Backfilling <br /> Atterberg Limits Test $95.00 4pertest i rOO'tests 10 $950.00 <br /> Percent Fines $75.00 per test 101tests 10 $750.00 <br /> 10 $1,600.00 <br /> Standard Proctor Test-4"Mold $160.00 ;per test 10'tests <br /> Engineering Technician $40.OD per hour 80IN4sits 6ihours/%Asit 480 $19,200.00 <br /> 80 $2,800.00 <br /> Nuclear Density Gauge $35.00 ;per trip 801V[sits <br /> Trip Charges $0.00 per trip 801*visits <br /> Subtotal $25,300.00 <br /> Foundation Subgrades <br /> %A hAsit <br /> Engineering Technician $40.00 per hour 2': sits 6hours <br /> Trip Charges $0.00 pertrip 2:\4sits 2 $0.00 <br /> Subtotal <br /> | <br /> Concrete Testing <br /> Engineering Technician $40.00 'Per hour 5\Wts 61hourshAsit 30 <br /> Concrete Cylinders-Comp.Strength $14.00 :each 6!sets 5'cylinders/sel 25 $350.00 <br /> Trip Charges $0.00 per trip 51\Asits 5 $0.00 <br /> Subtotal $1,550.00 <br /> Field Asphalt Testing <br /> Coring Crew $105.00 tper hour 2z\isits 6:hoursAAslt 12 $1,260.00 <br /> Asphalt Cores $50.00 each 61cores 6 $300.00 <br /> Trip Charges $0.00 "per trip 21visits <br /> Subtotal $1,560.00 <br /> Engineering Report Review <br /> Project Engineer $115.00 'Ver hour 16';hours 16 $1,840.00 <br /> Project Manager $95.00 per hour 32fturs 32 $3,040.00 <br /> Clerical $45.00 ::per hour 32,hou rs 32 $1,440.00, <br /> 7! Subtotal $6,320.001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.