Irerracon
<br /> Construction Materials Testing Services
<br /> Raleigh, NC
<br /> 2011-2012 UNIT RATE FEE SCHEDULE
<br /> PERSONNEL/FIELD SERVICES
<br /> 1. Engineering Technician, per hour....... .......... $ 40.00
<br /> 2: Field Special Inspector,per hour........ ......... ......... ......... ...............................$ 65.00
<br /> 3. Nuclear Density Gauge,per day..................... ......... .......:.......................... ............$ 35.00
<br /> 4. Certified Welding Inspector, per hour......................................... ......... ...........$ 85.00
<br /> 5. Ultrasonic Testing,per hour.. .... .... $ 90.00
<br /> 6. Coring Crew,per hour(Concrete/Asphalt,Includes equipment) .............$ 105.00
<br /> 7. Asphalt Lab or Roadway Technician, per hour ..................... .......,> .I...............$ 65.00
<br /> 8. Floor Flatness and Levelness testing(Operator and equipment)................................... 75.00
<br /> 9. Project Engineer,per hour...... ........ .......................$ 115.00
<br /> 10. Project Manager,per hour.................... ..w...... .....,... $ 95.00
<br /> 11. Senior Project Manager, per hour.................... ......... ......... ..........................................$ 105.00
<br /> 12. Principal,per hour...... ........ ............._...................._.........................................................$ 125.00
<br /> 13. Senior Principal, per hour............................................. .....:.... .........................................$ 145.00
<br /> 14. Clerical,per hour..........................................,.... .....:.................,...:...............*.................I.....$ 45.00
<br /> 15. Direct Expenses...................... .....,.......................... ......;..................................$ 125%
<br /> 16. Mileage,per mile......... ......... ........ ......... ......... ......... ........_ ............................. No Charge
<br /> LABORATORY SERVICES
<br /> 1. Percent Fines(Wash 200 sieve),each ......... ......... .......... ......... ......... .......$ 75.00
<br /> 2. Sieve Analysis,each.......................................... ..$ 100.00
<br /> 3. Particle Size Analysis(With Hydrometer),each ........ ,.......: ......... ................$ 150.00
<br /> 4. Natural Moisture Content Test,each... ..................... ......... :.................... ..:.............$ 10.00
<br /> 5. Atterberg Limits Test,each...... .... ..............$ 95.00
<br /> 6. Standard Proctor Compaction Test, each........ ..I.....I........_... .......... $ 160.00
<br /> 7. Modified Proctor Compaction Test,each .......: .............I....... ..... ....a......... ................$ 185.00
<br /> 8. Standard Proctor Compaction Test(with Rock Correction),each........................................$ 185.00
<br /> 9. CBR Testing, per point.................................................. .............................::.......................-$ 200.00
<br /> 10. Concrete:
<br /> a) Compressive Strength Testing of 4"x 8"or 6"x 12"Concrete Cylinders,each............$ 14.00
<br /> b) Flexural Strength Testing of Concrete Beams............................................. ..............,$ 50.00
<br /> c) Compressive Strength Testing of 2"x 2"Mortar Cubes,each........ ..:...... ...............$ 14.00
<br /> d) Compressive Strength Testing of Grout Prisms,each....... .. ...........$ 50.00
<br /> e) Compressive Strength Testing of Concrete Cores,each... ......... ............................$ 50.00
<br /> 11. Asphalt:
<br /> a) Thickness and Density Testing,per sample....................... .
<br /> .......................................... 50.00
<br /> NOTE: A minimum of 2 hours will be charged for all field technician time, Overtime,at a rate of 1.5 time the standard
<br /> rate,is charged for technician services for time over 8.0 hours per day,hours prior to 8:00 AM and past 5:00 PM and for
<br /> Saturdays,Sundays,and holidays. Overtime is not applicable to engineering rates. Project administration rates are for
<br /> report review,etc. The mileage charge includes vehicle mileage between Terracon's Raleigh office and the job site.
<br /> The quoted rates will be effective from January 1,2011 to December 31,2012,