Browse
Search
2011-362 Planning - Terracon Consultants, Inc. for Buckhorn Efland Phase 2 Sanitary Sewer Construction Materials Testing
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2011
>
2011-362 Planning - Terracon Consultants, Inc. for Buckhorn Efland Phase 2 Sanitary Sewer Construction Materials Testing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2016 11:29:41 AM
Creation date
12/14/2011 12:00:38 PM
Metadata
Fields
Template:
BOCC
Date
6/21/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5n - Manager Signed
Document Relationships
Agenda - 06-21-2011 - 5n
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2011\Agenda - 06-21-2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
One air content test will be performed for each strength test for air-entrained concrete. <br /> Temperature testing will be performed for each strength test and hourly when the air temperature is <br /> below 40 degrees F or above 90 degrees F. <br /> The lab-cured concrete specimens will be transported to our laboratory and placed in a controlled <br /> curing environment. From each set of 5 cylinders, 1 will be tested at 7 days and 3 will be tested at 28 <br /> days for compressive strength. The 5t'cylinder will be held in reserve. <br /> 4. Foundations— <br /> Verify foundation bearing capacity with a Dynamic Cone Penetrometer(DCP)in hand auger <br /> boreholes. <br /> Scheduling <br /> We understand that our services will be provided on an as-requested basis with scheduling by the <br /> contractor or the owner's representative. Terracon will not be responsible for scheduling our services and <br /> will not be responsible for tests that are not performed due to a failure to schedule our services on the <br /> project. It is the contractor's responsibility to inform us of work that is being conducted on-site that may <br /> require our services. Please also note Terracon must be notified at least 24 hours in advance of the next <br /> scheduled workday or must be notified that work has been cancelled prior to our site visit. <br /> Our services specifically exclude job site safety responsibility, and our services do not relieve any <br /> contractor/subcontractor from complying with project specifications. <br />
The URL can be used to link to this page
Your browser does not support the video tag.