Browse
Search
2011-362 Planning - Terracon Consultants, Inc. for Buckhorn Efland Phase 2 Sanitary Sewer Construction Materials Testing
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2011
>
2011-362 Planning - Terracon Consultants, Inc. for Buckhorn Efland Phase 2 Sanitary Sewer Construction Materials Testing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2016 11:29:41 AM
Creation date
12/14/2011 12:00:38 PM
Metadata
Fields
Template:
BOCC
Date
6/21/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5n - Manager Signed
Document Relationships
Agenda - 06-21-2011 - 5n
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2011\Agenda - 06-21-2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Irerralcon <br /> EXHIBIT B <br /> PROPOSED SCOPE OF SERVICES <br /> Central Efland/Northern Buckhorn Sewer Extension <br /> Orange County, NC <br /> Based on our understanding of the project information and our experience with similar projects, we <br /> anticipate providing the services listed below. Field and laboratory test procedures will follow ASTM and <br /> AWS standards. <br /> Terracon will maintain a record of observations and tests and deviations from the Contract Documents. The <br /> reports will be in writing and will be provided to the contractor and owner's agent for each day an inspection <br /> is made. <br /> Terracon will inform the contractor's on-site representative of deviations from the Contract Documents. Any <br /> deviations, which are not corrected will be included in the daily reports and added to the project deviation <br /> log. <br /> Terracon is not authorized to revoke, alter, relax, enlarge, or release any requirements of specifications, nor <br /> to approve, reject, or accept any portion of work. <br /> The testing program will generally include: <br /> 1. Structural fill— <br /> Terracon will obtain bulk samples of on-site cut and/or borrow material for soil laboratory testing. <br /> Soil laboratory testing will consist of a standard Proctor test (ASTM D 698),Atterberg Limits test, <br /> sieve analysis and a natural moisture content test. <br /> Terracon will perform density testing on the structural fill placed in the utility trenches using the sand <br /> cone density test method (ASTM D 1556), drive tube test method (ASTM D 2937) and/or the <br /> nuclear gauge density test method (ASTM D 2922). <br /> The percent compaction will be calculated by comparing the field density to the maximum dry <br /> density as determined by the standard Proctor test result. <br /> 2, Asphalt Paving— <br /> Terracon will provide a coring crew as requested to determine the thickness and density of the new <br /> asphalt pavement. Thickness testing will be performed in accordance to ASTM D 3549. Density <br /> testing will be performed in accordance with ASTM D 1188 or ASTM D 2726 (Target specific gravity <br /> of HMA provided by supplier). <br /> 3. Concrete— <br /> Terracon will provide an AGI certified engineering technician to perform slump, air content, unit <br /> weight and temperature tests during concrete placement. The technician will mold 5 concrete <br /> compression test specimens for each concrete mix placed each day. Concrete samples will be taken <br /> at the point of discharge wherever possible. <br /> One slump test will be performed for each strength test. Additional slump tests may be performed if <br /> the concrete consistency changes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.