Browse
Search
2011-362 Planning - Terracon Consultants, Inc. for Buckhorn Efland Phase 2 Sanitary Sewer Construction Materials Testing
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2011
>
2011-362 Planning - Terracon Consultants, Inc. for Buckhorn Efland Phase 2 Sanitary Sewer Construction Materials Testing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2016 11:29:41 AM
Creation date
12/14/2011 12:00:38 PM
Metadata
Fields
Template:
BOCC
Date
6/21/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5n - Manager Signed
Document Relationships
Agenda - 06-21-2011 - 5n
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2011\Agenda - 06-21-2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
err Un <br /> EXHIBIT A <br /> PROJECT INFORMATION <br /> Central Eftand/!Northern Buckhorn Sewer Extension <br /> Orange County, NC <br /> Terracon understands that the project consists of construction of an extension to the Eftand sewer <br /> system and an extension of the City of Mebane's sewer system into the Northern Buckhorn <br /> community. Work will include the installation of approximately 5,370 linear feet of 8 inch gravity <br /> sanitary sewers to serve the Buckhorn areas north of 1-40/85 and 19,514 linear feet of 8 inch <br /> gravity sewers with a 250 GPM pump station and 2,460 linear feet of 6 inch ductile iron force main <br /> to serve the Eftand community. <br />
The URL can be used to link to this page
Your browser does not support the video tag.