Browse
Search
2011-362 Planning - Terracon Consultants, Inc. for Buckhorn Efland Phase 2 Sanitary Sewer Construction Materials Testing
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2011
>
2011-362 Planning - Terracon Consultants, Inc. for Buckhorn Efland Phase 2 Sanitary Sewer Construction Materials Testing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2016 11:29:41 AM
Creation date
12/14/2011 12:00:38 PM
Metadata
Fields
Template:
BOCC
Date
6/21/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5n - Manager Signed
Document Relationships
Agenda - 06-21-2011 - 5n
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2011\Agenda - 06-21-2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Statement of Qualifications for Construction Material Testing Services Irerracon <br /> Central Efland/Northern Buckhorn Sewer Extension a Orange County,NC <br /> September 21,2011 a Terracon Proposal No.P70110416 <br /> conformance punch list log. The log will document the date and description of the <br /> non-conformance, associated report number of when the non-conformance was noted, action <br /> required to clear the item and the date when the item was corrected and cleared. The log will be <br /> maintained and tracked by our Project Manager and will be distributed regularly to the <br /> designated parties to assure that all items are cleared in a timely fashion. This log will help <br /> prevent non-conformances from lingering to a point where they become difficult to correct due to <br /> additional construction or obstruct the ability to receive a certificate of occupancy. <br /> When all items on our nonconformance log have been resolved, our Project Manager will issue <br /> final documentation of compliance for the items covered in our inspection program. <br /> Our project manager will track and compile the progress of our testing and inspection activities <br /> and submit an interim report. The weekly to bi-weekly report will include a summary of all <br /> testing and inspection services performed for the period, any non-conforming items and <br /> resolutions, the non-conformance log, copies of testing and inspections reports, and a concrete <br /> compressive strength test summary. - <br /> Provide Timely Reports. Terracon personnel will complete written inspection reports for each <br /> inspection visit and provide the reports on a timely basis. Terracon personnel will furnish these <br /> reports directly to the building official, the design team, and others as'designated. These <br /> reports will be organized on a daily format and will be electronically submitted every 2 to 5 days. <br /> Reports documenting non-conformances will be distributed within 24 hours. <br /> These reports will: <br /> • Describe inspection and tests made, with applicable location <br /> • Indicate how nonconforming items were resolved <br /> • List unresolved items, parties notified, time and method of notification <br /> In order to achieve better communication and faster turnaround of reporting, we propose to <br /> utilize our automated Construction Materials Engineering Laboratory Management System <br /> (CMELMSTM) on this project. Data and reports will be electronically entered by field staff each <br /> day. A hardcopy of the report can then be printed and personally delivered, sent electronically <br /> via e-mail and, if requested, may be posted to a project web site that can be accessed only by <br /> approved users. CMELMSTM will also track the budget and produce real-time budget reports. <br /> PROXIMITY TO AND FAMILIARITY WITH THE PROJECT AREA <br /> Terracon's Raleigh office is located off of Capital Boulevard in North Raleigh, convenient to both <br /> 1-440 and 1-540. This contract will be executed by the staff located in our Raleigh office and thus <br /> travel time to the project site will be no more than 45 minutes. The majority of our professionals <br /> have worked in and around central North Carolina their entire careers and thus are very familiar <br /> with the local geography, soils, and corresponding concerns for projects in the area. <br /> Reliable a Resourceful a Responsive <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.