Browse
Search
2011-362 Planning - Terracon Consultants, Inc. for Buckhorn Efland Phase 2 Sanitary Sewer Construction Materials Testing
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2011
>
2011-362 Planning - Terracon Consultants, Inc. for Buckhorn Efland Phase 2 Sanitary Sewer Construction Materials Testing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2016 11:29:41 AM
Creation date
12/14/2011 12:00:38 PM
Metadata
Fields
Template:
BOCC
Date
6/21/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5n - Manager Signed
Document Relationships
Agenda - 06-21-2011 - 5n
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2011\Agenda - 06-21-2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Statement of Qualifications for Construction Material Testing Services Irerracon <br /> Central Efland/Northern Buckhorn Sewer Extension n Orange County,NC <br /> September 21,2011 z Terracon Proposal No.P70110416 <br /> CONSULTANT PROFESSIONAL FEES <br /> Construction Materials Testing Services <br /> Raleigh, NC <br /> 2011-2012 UNIT RATE FEE SCHEDULE <br /> PERSONNEL/FIELD SERVICES <br /> 1. Engineering Technician, per hour..........................................................................................$ 40.00 <br /> 2. Field Special Inspector, per hour...........................................................................................$ 65.00 <br /> 3. Nuclear Density Gauge, per day............................................................................................$ 35.00 <br /> 4. Certified Welding Inspector, per hour....................................................................$ 85.00 <br /> 5. Ultrasonic Testing, per hour................................................................................$ 90.00 <br /> 6. Coring Crew, per hour(Concrete/Asphalt, includes equipment)..........................................$ 105.00 <br /> 7. Asphalt Lab or Roadway Technician, per hour.....................................................................$ 65.00 <br /> 8. Floor Flatness and Levelness testing (Operator and equipment)...................................$ 75.00 <br /> 9. Project Engineer, per hour.....................................................................................................$ 115.00 <br /> 10. Project Manager, per hour.....................................................................................................$ 95.00 <br /> 11. Senior Project Manager, per hour.........................................................................................$ 105.00 <br /> 12. Principal, per hour..................................................................................................................$ 125.00 <br /> SeniorPrincipal, per hour......................................................................................................$ 145.00 <br /> 14. Clerical, per hour....................................................................................................................$ 45.00 <br /> 15. Direct Expenses.....................................................................................................................$ 125% <br /> 16. Mileage, per mile.................................................................................................................... No Charge <br /> LABORATORY SERVICES <br /> 1. Percent Fines(Wash 200 sieve), each.................................................................................$ 75.00 <br /> 2. Sieve Analysis,each..............................................................................................................$ 100.00 <br /> 3. Particle Size Analysis(With Hydrometer), each....................................................................$ 150.00 <br /> 4. Natural Moisture Content Test, each.....................................................................................$ 10.00 <br /> 5. Atterberg Limits Test, each....................................................................................................$ 95.00 <br /> 6. Standard Proctor Compaction Test, each.............................................................................$ 160.00 <br /> 7. Modified Proctor Compaction Test, each..............................................................................$ 185.00 <br /> 8. Standard Proctor Compaction Test(with Rock Correction), each........................................$ 185.00 <br /> 9. CBR Testing, per point..........................................................................................................$ 200.00 <br /> 10. Concrete: <br /> a) Compressive Strength Testing of 4"x 8"or 6"x 12"Concrete Cylinders,each............$ 14.00 <br /> b) Flexural Strength Testing of Concrete Beams...............................................................$ 50.00 <br /> c) Compressive Strength Testing of 2"x 2"Mortar Cubes, each......................................$ 14.00 <br /> d) Compressive Strength Testing of Grout Prisms, each...................................................$ 50.00 <br /> e) Compressive Strength Testing of Concrete Cores, each..............................................$ 50.00 <br /> 11. Asphalt: <br /> a) Thickness and Density Testing, per sample..................................................................$ 50.00 <br /> NOTE: A minimum of 2 hours will be charged for all field technician time. Overtime, at a rate of 1.5 time the standard <br /> rate, is charged for technician services for time over 8.0 hours per day,hours prior to 8:00 AM and past 5:00 PM and for <br /> Saturdays, Sundays, and holidays. Overtime is not applicable to engineering rates. Project administration rates are for <br /> report review, etc. The mileage charge includes vehicle mileage between Terracon's Raleigh office and the job site. <br /> The quoted rates will be effective from January 1,2011 to December 31,2012. <br /> Reliable a Resourceful n Responsive <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.