Orange County NC Website
00, <br /> [Departmental Use Only] <br /> TITLE Bus Shelter- DTCC <br /> FY 2012 <br /> NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT UNDER$250,000.00 <br /> ORANGE COUNTY <br /> S CONSTRUCTION AGREEMENT (hereinafter called "Agreement"), made as of the Z day of <br /> Ll< and <br /> 20 t I by and between DOT Construction, Inc., (hereinafter called the "Contractor"), an g <br /> ounty, a body corporate and politic and a political subdivision of the State of North Carolina, (hereinafter called <br /> the"Owner"). <br /> WITNESSETH: <br /> That the Contractor and the Owner,for the consideration herein named, agree as follows: <br /> 1. SCOPE OF WORK <br /> The Contractor shall furnish and deliver all of the materials, and perform all of the work required by this <br /> Agreement within the time period stipulated in a written Notice-to-Proceed to be executed by the Contractor and <br /> Owner and in accordance with the following enumerated documents, which are attached hereto and made a part <br /> hereof as if fully contained herein: <br /> a. Construction Drawings prepared by n/a(Sheet n/a dated n/a) <br /> b. Written specifications prepared by the project engineer. <br /> c. 367-1616 proposal dated April 20, 2011 which fully describes the work to be performed, such work <br /> hereinafter called the"Work". <br /> d. Other documents as follows: n/a. <br /> 2. TERM AND SCHEDULING <br /> a. The Contractor agrees to commence work on the date of the executed original of this Agreement <br /> and agrees to complete fully all Work included by January 3,2012. <br /> b. Time is of the essence with respect to all dates specified in the Contract Documents as Completion <br /> Dates. <br /> c. The Contractor shall perform the Work in the time, manner and form required by the Contract <br /> Documents and as stipulated in a written Notice-to-Proceed to be executed by the Contractor and <br /> Owner. <br /> d. It is expressly understood that the Owner will employ other contractors to perform work as a part <br /> of the Project whose work will be performed simultaneously and sequentially with the performance <br /> of the Work by the Contractor. It shall be necessary for the Contractor to coordinate its activities <br /> with such other contractors, particularly with respect to access to work areas, storage of materials <br /> and other common facilities. <br /> e. Should the Owner determine that the Contractor is behind schedule, it may require the Contractor <br /> to expedite and accelerate its efforts, including providing additional resources and working <br /> overtime, as necessary, to perform the Work in accordance with the approved project schedule at <br /> no additional cost to the Owner. <br /> Revised December 2010 1 <br />