Browse
Search
2011-356 County Manager - Triangle J Council of Governments for Electric Vehicle Charging Stations
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2011
>
2011-356 County Manager - Triangle J Council of Governments for Electric Vehicle Charging Stations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2014 3:32:14 PM
Creation date
12/9/2011 11:08:54 AM
Metadata
Fields
Template:
BOCC
Date
11/15/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5i
Document Relationships
Agenda - 11-15-2011 - 5i
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2011\Agenda - 11-15-2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NETL F 451.1 -1/3 <br />(11/2007) OPI =320 <br />(Page 10) U.S. DEPARTMENT OF ENERGY <br />ENVIRONMENTAL QUESTIONNAIRE <br />f. Describe any increases in ambient noise levels to the public from construction and operational activities. <br />❑ None ❑ Increase in ambient noise level (describe) <br />g. Would project construction result in the removal of natural barriers that act as noise screens? <br />❑ No construction planned ❑ No ❑ Yes (describe) <br />h. Would hearing protection be required for workers? ❑ No ❑ Yes (describe) <br />10. Environmental Restoration and/or Waste Management <br />a. Would the proposed project include CERCLA removals or similar actions under RCRA or other authorities? <br />❑ No ❑ Yes (describe) <br />b. Would the proposed project including siting, construction, and operation of temporary pilot -scale waste collection and <br />treatment facilities or pilot -scale waste stabilization and containment facilities? ❑ No ❑ Yes (describe) <br />C. Would the proposed project involve operations of environmental monitoring and control systems? <br />❑ No ❑ Yes (describe) <br />d. Would the proposed project involve siting, construction, operation, and decommissioning of a facility for storing <br />packaged hazardous waste for 90 days or less? ❑ No ❑ Yes (describe) <br />E. REGULATORY COMPLIANCE <br />1. For the following laws, describe any existing permits, new or modified permits, manifests, responsible authorities or <br />agencies, contacts, etc., that would be required for the proposed project (Information on the following environmental <br />laws can be found at Major Enviromnental Law website): <br />a. Resource Conservation and Recovery Act (RCRAI: ❑ None ❑ Required (describe) <br />b. Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA): <br />❑ None ❑ Required (describe) <br />C. Toxic Substance Control Act (TSCA): ❑ None ❑ Required (describe) <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.