Browse
Search
2011-356 County Manager - Triangle J Council of Governments for Electric Vehicle Charging Stations
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2011
>
2011-356 County Manager - Triangle J Council of Governments for Electric Vehicle Charging Stations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2014 3:32:14 PM
Creation date
12/9/2011 11:08:54 AM
Metadata
Fields
Template:
BOCC
Date
11/15/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5i
Document Relationships
Agenda - 11-15-2011 - 5i
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2011\Agenda - 11-15-2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NETL F 451.1 -1/3 <br />(11/2007) OPI =320 <br />(Page 8) U.S. DEPARTMENT OF ENERGY <br />ENVIRONMENTAL QUESTIONNAIRE <br />d. What would be the major components of each type of wastewater (e.g., coal fines)? ❑ No wastewater produced <br />e. Identify the local treatment facility that would receive wastewater from the proposed project. <br />❑ No discharges to local treatment facility <br />f. Describe how wastewater would be collected and treated. <br />g. Would any run -off or leachates be produced from storage piles or waste disposal sites? ❑ No ❑ Yes (describe source) <br />h. Would project require issuance of new or modified water permits to perform project work or site development <br />activities? ❑ No ❑ Yes (describe) <br />L Where would wastewater effluents from the proposed project be discharged? ❑ No wastewater produced <br />j. Would the proposed project be permitted to discharge effluents into an existing body of water? <br />❑ No ❑ Yes (describe water use and effluent impact) <br />k. Would a new or modified National Pollutant Discharge Elimination System (NPDES) permit be required? <br />❑ No ❑ Yes (describe) <br />Would the proposed project adversely affect the quality or movement of groundwater? ❑ No ❑ Yes (describe) <br />m. Would the proposed project require issuance of an Underground Injection Control (UIC) permit? <br />❑ No ❑ Yes (describe) <br />8. Solid and Hazardous Wastes <br />a. Identify and estimate major non - hazardous solid wastes that would be generated from the project. Solid wastes are <br />defined as any solid, liquid, semi - solid, or contained gaseous material that is discarded or has served its intended <br />purpose, or is a manufacturing or mining by- product (See EPA Municipal Solid Waste and Municipal Solid by State). <br />❑ Municipal solid waste, i.e., paper, plastic, etc. <br />annual Qiant�ty� <br />❑ Coal or coal by- products <br />❑ Other -- Identify: <br />❑ None <br />
The URL can be used to link to this page
Your browser does not support the video tag.