Orange County NC Website
NETL F 451.1 -1/3 <br />(11/2007) OPI =320 <br />(Page 7) U.S. DEPARTMENT OF ENERGY <br />ENVIRONMENTAL QUESTIONNAIRE <br />e. What types of air emissions, including fugitive emissions, would be anticipated from the proposed project, and what <br />would be the maximum annual rate of emissions for the project? <br />1Vlaxtnm peYYear , ,Total for roJect On <br />❑ so. <br />❑ NOX <br />❑ PM - 2.5 <br />❑ PM - 10 <br />❑ CO <br />❑ co, <br />❑ Lead <br />❑ H2S <br />❑ Organic solvent vapors or other volatile organic compounds - -List: <br />❑ Hazardous air pollutants -- List: <br />❑ Other -- List: <br />❑ None <br />f. Would any types of emission control or particulate collection devices be used? <br />❑ No ❑ Yes (describe, including collection efficiencies) <br />g. If no control devices are used, how would emissions be vented? <br />7. Hydrologic Conditions/Water Quality <br />a. What is the closest body of water to the proposed project area and what is its distance from the project site? <br />b. What sources would supply potable and process water for the proposed project? <br />C. Quantify the daily or annual amount of wastewater that would be generated by the proposed project. <br />'� `�Galloans <br />❑ Non - contact cooling water <br />❑ Process water <br />❑ Sanitary and/or grey water <br />❑ Other -- describe: <br />❑ None <br />7 <br />