Browse
Search
2011-356 County Manager - Triangle J Council of Governments for Electric Vehicle Charging Stations
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2011
>
2011-356 County Manager - Triangle J Council of Governments for Electric Vehicle Charging Stations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2014 3:32:14 PM
Creation date
12/9/2011 11:08:54 AM
Metadata
Fields
Template:
BOCC
Date
11/15/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5i
Document Relationships
Agenda - 11-15-2011 - 5i
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2011\Agenda - 11-15-2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NETL F 451.1 -1/3 <br />(11/2007) OPI =320 <br />(Page 5) U.S. DEPARTMENT OF ENERGY <br />ENVIRONMENTAL QUESTIONNAIRE <br />f. Describe any instability (e.g., subsidence, perma- frost, erosion, faulting/fracturing) affecting building construction, site <br />development, and/or project operation. <br />3. Vegetation and Wildlife Resources <br />a. Identify any State or Federal - listed endangered or threatened plant or animal species affected by the proposed project. <br />❑ None <br />b. Would any threatened or endangered species habitat be affected by the proposed project? ❑ No ❑ Yes (describe) <br />C. Describe any impacts that construction would have on any other s of sensitive or unique habitats. <br />❑ No planned construction ❑ No habitats 6 None ❑ Impact (describe) <br />d. Would any unnatural substances /materials be introduced into ground or surface waters, soil, or other earth/geologic <br />resource because of project activities? How would these foreign substances /materials affect the water, soil, and <br />geologic resources? ❑ No ❑ Yes (describe) <br />e. Would any migratory animal corridors be impacted or disrupted by the proposed project? ❑ No ❑ Yes (describe) <br />4. Socioeconomic and Infrastructure Conditions <br />a. Would local socio- economic changes result from the proposed project? ❑ No ❑ Yes (describe) <br />b. Would the proposed project generate increased traffic use of roads through local neighborhoods, urban or rural areas? <br />❑ No ❑ Yes (describe) <br />C. Would the proposed project require new transportation access (roads, rail, etc.)? Describe location, impacts, costs. <br />❑ No ❑ Yes (describe) <br />d. Would the proposed project create a significant increase in local energy usage? ❑ No ❑ Yes (describe) <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.