Browse
Search
2011-356 County Manager - Triangle J Council of Governments for Electric Vehicle Charging Stations
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2011
>
2011-356 County Manager - Triangle J Council of Governments for Electric Vehicle Charging Stations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2014 3:32:14 PM
Creation date
12/9/2011 11:08:54 AM
Metadata
Fields
Template:
BOCC
Date
11/15/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5i
Document Relationships
Agenda - 11-15-2011 - 5i
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2011\Agenda - 11-15-2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NETL F 451.1 -1/3 <br />(11/2007) OPI =320 <br />(Page 3) U.S. DEPARTMENT OF ENERGY <br />ENVIRONMENTAL QUESTIONNAIRE <br />10. Identify major materials that would be used and produced by the project when projects are larger than lab or bench <br />scale. <br />�Mater,�als�sec� °(in ut) . „�Eshmafe Quantity` Mater,�als�P�r�a�duced,;(pu�nt) �zEst►matesQnanhty � 1. <br />❑ Coal ❑ Wastewater <br />❑ Natural Gas ❑ Air Emissions <br />❑ Oil ❑ Solid Waste <br />❑ Electricity ❑ Hazardous Waste <br />❑ Water ❑ Others -- List: <br />❑ Others -- List: <br />B. - PROPOSED PROJECT ALTERNATIVES <br />If applicable, list any project alternative considered to achieve the project objectives. <br />C. PROJECT LOCATION <br />1. Provide a brief description of the project location (physical location, surrounding area, adjacent structures). <br />2. Attach a project site location map of the project work area. Project site photos and topographical maps may be <br />requested for further review. <br />D. ENVIRONMENTAL IMPACTS <br />This section is designed to obtain information concerning environmental impacts and regulatory compliance of a proposed <br />project. NEPA procedures require evaluations of possible effects (including land use, energy resource use, natural, historic <br />and cultural resources, and pollutants) from proposed projects on the environment. The Environmental Virtual Campus <br />website has valuable information concerning environment impacts and regulatory compliance. <br />1. Land Use <br />a. Characterize present land use where the proposed project would be located. <br />❑ Urban ❑ Industrial ❑ Commercial ❑ Agricultural <br />❑ Suburban ❑ Rural ❑ Residential ❑ Research Facilities <br />Forest ❑ University Campus ❑ Other: <br />b. Identify the total size of the facility, structure, or system and what portion would be used for the proposed project. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.