NETL F 451.1 -1/3
<br />(11/2007) OPI =320 U.S. DEPARTMENT OF ENERGY
<br />(Page 2)
<br />ENVIRONMENTAL QUESTIONNAIRE
<br />Group A -7b
<br />Categorical Exclusion CX -B: Laboratory Scale Research, Bench Scale Research, Pilot Scale Research, Proof -of-
<br />Concept Scale Research, or Field Test Research. Work DOES NOT involve new building/facilities construction and
<br />site " excavation/groundbreaking activities. This work typically involves routine operation of existing laboratories,
<br />commercial buildings /properties, offices and homes, project test facilities, factories /power plants, vehicles test stands
<br />and components, refueling facilities, utility systems, or other existing structures /facilities. Work will NOT involve
<br />major change in facilities missions and operations, land use planning, new /modified regulatory/operating permit
<br />requirements. Includes work specific to routine DOE Site operations and Lab research work activities, but NOT
<br />building construction and site preparation. DOE work typically involves laboratory facilities and lab equipment
<br />operations, buildings and grounds management activities; and buildings and facilities maintenance, repairs,
<br />reconfiguration, remodeling, equipment use and replacement.
<br />Group A -7e
<br />El Categorical Exclusion CX -B, Environmental Assessment (EA), Environmental Impact Statement (EIS): Pilot Test
<br />Facilities Construction, Pilot Scale Research, Field Scale Demonstration, or Commercial Scale Application. Work
<br />typically involves facility construction, site preparation /excavation/groundbreaking, and/or demolition. This work
<br />would include construction, retrofit, replacement, and/or major modifications of laboratories, test facilities, energy
<br />system prototypes, and power generation infrastructure. Work may also involve construction and maintenance of
<br />utilities system right -of -ways, roads, vehicle test facilities, commercial buildings /properties, fuel refinery/mixing
<br />facilities, refueling facility, power plants, underground wells, and pipelines, and other types of energy research related
<br />facilities. This work may require new or modified regulatory permits, environmental sampling and monitoring
<br />requirements, master planning, public involvement, and environmental impact review. Includes work specific to DOE
<br />Site Operations and Lab operation activities involving building and facilities construction, replacement,
<br />decommissioning /demolition, site preparation, land use changes, or change in research facilities mission or operations.
<br />Other (please describe):
<br />If all work activities related to this project can be classified and described within categories under item A- 7a, it is a
<br />categorically excluded action. Proceed directly to Section IV CERTIFICATION BYPROPOSER, completing
<br />information and signatures as requested. The questionnaire is now complete and no additional information is
<br />required.
<br />Ifproject work activities are described under either items) A -7b, or A -7c.; then continue filling out questionnaire
<br />,starting below with Question A.8.
<br />Summarize the objectives of the proposed work. List activities planned at the location as covered by this
<br />Environmental Questionnaire.
<br />9. List all other locations where work would be performed by the primary contractor of the project and primary
<br />subcontractor(s). (Note: An environmental questionnaire may be required for each new location after reviewing the
<br />SOW /SOPO, project scope, tasks, and environmental affects).
<br />
|