Orange County NC Website
NETL F 451.1 -1/3 <br />(11/2007) OPI =320 U.S. DEPARTMENT OF ENERGY <br />(Page 2) <br />ENVIRONMENTAL QUESTIONNAIRE <br />Group A -7b <br />Categorical Exclusion CX -B: Laboratory Scale Research, Bench Scale Research, Pilot Scale Research, Proof -of- <br />Concept Scale Research, or Field Test Research. Work DOES NOT involve new building/facilities construction and <br />site " excavation/groundbreaking activities. This work typically involves routine operation of existing laboratories, <br />commercial buildings /properties, offices and homes, project test facilities, factories /power plants, vehicles test stands <br />and components, refueling facilities, utility systems, or other existing structures /facilities. Work will NOT involve <br />major change in facilities missions and operations, land use planning, new /modified regulatory/operating permit <br />requirements. Includes work specific to routine DOE Site operations and Lab research work activities, but NOT <br />building construction and site preparation. DOE work typically involves laboratory facilities and lab equipment <br />operations, buildings and grounds management activities; and buildings and facilities maintenance, repairs, <br />reconfiguration, remodeling, equipment use and replacement. <br />Group A -7e <br />El Categorical Exclusion CX -B, Environmental Assessment (EA), Environmental Impact Statement (EIS): Pilot Test <br />Facilities Construction, Pilot Scale Research, Field Scale Demonstration, or Commercial Scale Application. Work <br />typically involves facility construction, site preparation /excavation/groundbreaking, and/or demolition. This work <br />would include construction, retrofit, replacement, and/or major modifications of laboratories, test facilities, energy <br />system prototypes, and power generation infrastructure. Work may also involve construction and maintenance of <br />utilities system right -of -ways, roads, vehicle test facilities, commercial buildings /properties, fuel refinery/mixing <br />facilities, refueling facility, power plants, underground wells, and pipelines, and other types of energy research related <br />facilities. This work may require new or modified regulatory permits, environmental sampling and monitoring <br />requirements, master planning, public involvement, and environmental impact review. Includes work specific to DOE <br />Site Operations and Lab operation activities involving building and facilities construction, replacement, <br />decommissioning /demolition, site preparation, land use changes, or change in research facilities mission or operations. <br />Other (please describe): <br />If all work activities related to this project can be classified and described within categories under item A- 7a, it is a <br />categorically excluded action. Proceed directly to Section IV CERTIFICATION BYPROPOSER, completing <br />information and signatures as requested. The questionnaire is now complete and no additional information is <br />required. <br />Ifproject work activities are described under either items) A -7b, or A -7c.; then continue filling out questionnaire <br />,starting below with Question A.8. <br />Summarize the objectives of the proposed work. List activities planned at the location as covered by this <br />Environmental Questionnaire. <br />9. List all other locations where work would be performed by the primary contractor of the project and primary <br />subcontractor(s). (Note: An environmental questionnaire may be required for each new location after reviewing the <br />SOW /SOPO, project scope, tasks, and environmental affects). <br />