Orange County NC Website
O+ E -- ~ ;f~ii <br />Sta#ion to MLK 1r. Parkway Station (BR7-Cow Alternative 2), and Shannon Drive to Pickett Road (BRT- <br />Low Alternative 3). A total of 18 station locations are. proposed. <br />The alternatives were evaluated based on seven evaluation criteria directly related to the project goals. <br />These .criteria were Ridership,. Transportation Operations, Expansion Potential, Economic Development <br />Potential, Public and Agency Support, and Environmental Impacts. Table ES-1 summarizes the <br />evaluation results.1 A discussion of how well the alternatives performed relative to the project goals <br />follows the table. <br />1 Public and agency support is excluded from the summary table because of the limited amount of data available <br />for evaluation. See Section 3.2.4 of the Detailed Definition of Alternatives Technical Report for more information. <br />L9st~ ,.::. :;. ~ a : w ~"„ „~¢,a {"',fit. ~. e' ~, i;~ . : , •: 2(l^'4, i "?'_ <br />