Browse
Search
Agenda - 12-08-2011 - Attachment 2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 12-08-2011
>
Agenda - 12-08-2011 - Attachment 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2012 1:01:10 PM
Creation date
12/6/2011 12:27:03 PM
Metadata
Fields
Template:
BOCC
Date
12/8/2011
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
Attachment 2
Document Relationships
Minutes 12-08-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 3, 2010 <br />A choice of Alignment 3 would probably require most of those 24 buses in service in the NC 54 corridor <br />to remain in operation in that location, reducing redeployment, feeder bus, and peak period operating <br />cost reduction opportunities. <br />Right-of-Way Availability <br />As previously mentioned, right-of-way has been preserved for Alignment 1, possibly at no cost. <br />Additional right-of-way may have to be purchased for Alignment 2, particularly if the NC 54 corridor <br />study recommendations for road improvements are implemented. An initial review of property maps <br />indicates that the right-of-way width along US 15-501 (Alignment 3), including the parallel service roads, <br />is a minimum of 200 feet. It is possible that right-of-way may have to be purchased in places. It is <br />assumed that the redevelopment of Ram's Plaza will donate right-of-way close to US 15-501 for transit. <br />CONCLUSIONS <br />As outlined above, there are strong arguments for the alignment to remain in the NC 54 corridor. A <br />desktop environmental evaluation of the three alignments does not indicate any environmental fatal <br />flaws associated, with any of the alignments. A detail environmental study and coordination with the <br />federal and state regulatory agencies is needed before a definitive recommendation can be made as to <br />which of the two NC 54 alignments has the least overall environment impacts, particularly as to the <br />preferred location for crossing the Corps land. No permits for crossing federally-owned lands or <br />wetlands have been obtained for the adopted alignment. <br />P:\Transit\2010021 TT Program Management\AA\Durham-CH\NC s4 Alignment Paper 090310.doc <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.