Browse
Search
ORD-2011-028 Budget Ordinance Amendment #1B for $192,243 Link Center Geothermal HVAC
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2010-2019
>
2011
>
ORD-2011-028 Budget Ordinance Amendment #1B for $192,243 Link Center Geothermal HVAC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2019 3:11:52 PM
Creation date
12/5/2011 4:10:04 PM
Metadata
Fields
Template:
BOCC
Date
9/8/2011
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
8c
Document Relationships
Agenda - 09-08-2011 - 8c
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2011\Agenda - 09-08-2011
Minutes 09-08-2011
(Attachment)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5,370 linear feet of 8 inch gravity sanitary sewers to serve the Buckhorn Area north of 1 -85 and <br />19,514 linear feet of 8 inch gravity sewers with a 250 G.P.M. Pump Station and 2,460 linear feet <br />of 6 inch ductile iron force main to serve the Efland Community. Bids for this project were <br />advertised and received on June 23, 2011. Nine bidders submitted responses to the solicitation <br />including Triangle Grading & Paving. <br />Subsequent to the opening of the bids on June 23, 2011, a difference of opinion arose between <br />Triangle Grading & Paving and County Staff over the parties' respective rights and obligations <br />arising out of the bidding process. In order to avoid a legal dispute, Staff has recommended <br />that Triangle Grading and Paving's bid be deemed to have been timely withdrawn, without <br />penalty of forfeiture of its bid bond. <br />B.1.b: To consider a Resolution awarding the construction contract for Central Efland Phase 2 <br />and North Buckhorn sewer system extensions to J. F. Wilkerson Contracting Company. <br />BACKGROUND: Bids were received for this project (Project No. CS370884 -01, STAG Project <br />No. XP- 95456511 -0) on June 23, 2011. After a period of review of the bid documents by the <br />County's engineering consultant, Coulter, Jewell, Thames, and due diligence investigation by <br />County staff, J.F. Wilkerson Contracting Company was determined to be a responsive, <br />responsible bidder for this project. With the agreed to withdrawal of Triangle Grading & <br />Paving's bid, J.F. Wilkerson Contracting Company becomes the lowest, responsive and <br />responsible bidder for this project. <br />Because this project is funded by both an EPA Special Appropriations Grant and a State <br />Revolving Fund Loan, the State Construction Grants & Loans (CG &L) office must review the bid <br />documents and other information regarding the project prior to issuing an "Authority to Award" <br />notice to the County. The deadlines imposed by the SRF Loan process required that Orange <br />County be issued the "Authority to Award" from the State CG &L office on or before August 1, <br />2011, or risk losing the SRF Loan funds. As a part of the Project Bid Information packet, the <br />CG &L office typically requires that the governing board adopt a Resolution of Tentative Award, <br />which says the board intends to award the contract to the lowest, responsible, responsive <br />bidder once given the "Authority to Award" from the State. <br />In this case, however, the BOCC was on summer breaks when the bids came in. This meeting <br />is the first opportunity available for the Resolution of Tentative Award. The CG &L office has <br />granted the County a variance from its normal procedure by allowing the BOCC to adopt the <br />Resolution of Award now, after the Authority to Award had been issued by the State on August <br />1, 2011. Therefore, the Resolution before the Board is a Resolution of Award rather than a <br />Resolution of Tentative Award because the State has already reviewed the contractor choice <br />and issued the Authority to Award. <br />This Resolution, along with the actual contract and supporting documents, will be submitted to <br />the State CG &L office for review. Submission and approval of the contract documents and this <br />Resolution are required in order to meet the next funding deadline on September 1, 2011. <br />J.F. Wilkerson submitted the lowest responsible bid that was responsive. A copy of the <br />tabulation is Attachment 3. The Resolution of Award is Attachment 4. If the Board awards this <br />bid, a notice to proceed will be issued in mid - September with an estimated completion date of <br />December 2012. <br />
The URL can be used to link to this page
Your browser does not support the video tag.