Browse
Search
ORD-2011-028 Budget Ordinance Amendment #1B for $192,243 Link Center Geothermal HVAC
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2010-2019
>
2011
>
ORD-2011-028 Budget Ordinance Amendment #1B for $192,243 Link Center Geothermal HVAC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2019 3:11:52 PM
Creation date
12/5/2011 4:10:04 PM
Metadata
Fields
Template:
BOCC
Date
9/8/2011
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
8c
Document Relationships
Agenda - 09-08-2011 - 8c
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2011\Agenda - 09-08-2011
Minutes 09-08-2011
(Attachment)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
oR p_ ,R00 - oaB <br />ORANGE COUNTY <br />BOARD OF COMMISSIONERS <br />ACTION AGENDA ITEM ABSTRACT <br />Meeting Date: September 8, 201 -1 <br />Action Agenda <br />Item No. 8" C <br />SUBJECT: Bid Award: Link Center Geothermal HVAC and Approval of Budget <br />Amendment # 1 -B <br />DEPARTMENT: Asset Management Services PUBLIC REARING: (Y /N) No <br />(AMS), Financial Services <br />ATTACHMENT(S): <br />A) Certified Bid Tabulation <br />B) Contract <br />PURPOSE: To consider: <br />INFORMATION CONTACT: <br />Pam Jones, AMS, (919) 245 -2652 <br />Jeff Thompson, AMS, (919) 245 -2658 <br />Michael Talbert, Financial- Services, <br />(919) 245 -21 -53 <br />David Cannell, Financial Services, <br />(919) 245 -265 -1 <br />• Awarding the -bid _and approving a construction contract to Warren Hay Mechanical, <br />Hillsborough NC, in the amount of $679,326 for the installation of the geothermal HVAC <br />system at John M. Link, Jr. Government Services Center to replace the existing system; <br />• Approving Budget Amendment #1 -B for $192,243; <br />• Authorizing the Chair to sign the contract on behalf of the Board of County <br />Commissioners, subject to final review by the County Attorney; and <br />• Authorizing the Manager to execute individual change orders within the limit of his <br />authority ($250,000) up to the extent of the project budget. <br />BACKGROUND: On May 17, 2011, the BOCC reviewed the analysis and schematic probable <br />cost estimate for the installation of geothermal wells and related HVAC equipment for the Link <br />Government Services Center. The BOCC also authorized staff to proceed- with formal <br />Construction Document preparation and bidding of the project. <br />Competitive bids were opened on July 27, 2011, (see Attachment A, "Certified Bid Tabulation "). <br />After a period of review of the bid documents by the County's engineering consultant, Reece, <br />Noland & McElrath, Inc., Warren Hay Mechanical was determined to be the lowest responsive, <br />responsible bidder for this project. <br />Bids received were in excess of the schematic cost estimate provided to the BOCC on May 17, <br />2011. Staff conducted a rigorous value engineering exercise with the Warren Hay and <br />successfully eliminated $94,300 in costs to the project without sacrificing the quality or breadth <br />
The URL can be used to link to this page
Your browser does not support the video tag.