Browse
Search
Agenda - 12-05-2011 - 8b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 12-05-2011
>
Agenda - 12-05-2011 - 8b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2012 12:56:33 PM
Creation date
12/2/2011 3:57:58 PM
Metadata
Fields
Template:
BOCC
Date
12/5/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8b
Document Relationships
Minutes 12-05-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br />dropping items in the book d <br />As discussed by the County Manager, AMS Director, and Library Director the options available <br />are: <br />1) Provide a `drive-by' book drop located at the corner piece of "right-of--way" into the Eno <br />River Parking Deck. Staff has determined the necessary steps (See Option 1 in the <br />attached Analysis) and the capital costs and library service impacts necessary .to <br />complete this project. <br />2) Provide an alternate walkable book drop at the handicapped ramp located on the east <br />side of the building. This option will reduce the area for the collection in the Children's <br />Department. Staff has determined the necessary steps (See Option 2 in the attached <br />Analysis) and-the capital costs and library service reductions necessary to complete this <br />project. <br />3) Clearly mark and have staff monitor use of a "Book Drop" parking spot located along the <br />library parking, next to ,the handicapped parking places (See Option 3 in the attached <br />Analysis). <br />FINANCIAL IMPACT: Approximately $1,400 was recently spent to replace the interior book <br />drop inserts. Costs of construction and/or building modifications to address Options 1 and 2 <br />vary contingent upon the option chosen. <br />Costs for Options <br />Option 1 - $15,600 plus the unknown cost of the Hillsborough-approved structure <br />Option 2 -Unknown, but expected to be greater than $15,600 plus cost of Hillsborough- <br />approved structure and addressing any potential building structural issues <br />that may arise <br />Option 3 - $150 <br />Options 1 and 2 will also require permit approval by the Town of Hillsborough's Planning <br />Department and Historic District Commission plus any associated costs. <br />RECOMMENDATION(S): The Manager recommends that the Board review and provide <br />direction regarding whether a need exists to accommodate the request of the resident and the <br />preferred Option. <br />
The URL can be used to link to this page
Your browser does not support the video tag.