Orange County NC Website
improvements are warranted as to design, materials and workmanship for a period of twelve <br />months from the date of acceptance by the City or such longer period as may be set forth in the <br />applicable statute of limitations. <br />The undersigned further represents and warrants that all labor and materials employed on said <br />project(s) have been paid in full. <br />Name: Clarence Grier <br />Title: Oran e Coun Finance Director <br />Signature: ~~G*-k. ,~J'tts~~ <br />Date: ~ ~ 1 ~ ~ ~ <br />Acceptance by City of Mebane <br />Based on the foregoing representations, and in reliance thereon, Orange County has accepted the <br />foregoing improvements and/or utilities for public ownership and maintenance, effective the <br />day of , 20. <br />acceptance set forth herein. <br />.All warranties shall run from the date of <br />16 <br />City Engineer <br />