Browse
Search
Agenda - 12-05-2011 - 5l
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 12-05-2011
>
Agenda - 12-05-2011 - 5l
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2012 12:54:50 PM
Creation date
12/2/2011 3:52:37 PM
Metadata
Fields
Template:
BOCC
Date
12/5/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5l
Document Relationships
Minutes 12-05-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY <br />BOARD OF COMMISSIONERS <br />ACTION AGENDA ITEM ABSTRACT <br />Meeting Date: December 5, 2011 <br />Action Agenda <br />Item No. r_ J- <br />SUBJECT: Formal Transfer of Ownership of Buckhorn-Mebane Water and Sewer Utilities <br />Phase I (also known as Gravelly Hill Middle School System) to the City of <br />Mebane <br />DEPARTMENT: Planning and Inspections PUBLIC HEARING: (Y/N) No <br />ATTACHMENT(S): <br />1. Engineer's Certification <br />a. Paul Thames, PE <br />b. Mike Hammersley, PE <br />2. Certificate of Completion of Water and <br />Sewer Improvements <br />3. Bill of Sale Transfer Document <br />4. Map/Survey showing assets <br />5.Original Easements <br />a. Water and Sewer <br />b. Lift Station <br />INFORMATION CONTACT: <br />Craig Benedict, 245-2585 <br />John Roberts, 245-2318 <br />Kevin Lindley, 245-2583 <br />PURPOSE: To transfer ownership of water and sewer facilities constructed by Orange County <br />and the property on which the Gravelly Hill Middle School pump station is built to the City of <br />Mebane. <br />BACKGROUND: Buckhorn-Mebane Utilities Phase I was installed by an Orange County <br />contractor and completed in 2007 to service Gravelly Hill Middle School and to a certain degree <br />other adjacent areas. Prior to this time (March 2004), Orange County and the City of Mebane <br />signed an interlocal utility service area agreement that set forth conditions of design, <br />construction, and project `close out'. The project `close out' includes state permit approvals for <br />usage, 'as builts', easement transfers, and formal transfer of ownership of installations including <br />water lines, fire hydrants, and gravity and force main sewer systems, as well as the sewage <br />pump station and associated property. Facilities include those noted in North Carolina <br />Department of Environment & Natural Resources (DENR) Permit #WQ00229683 issued March <br />31, 2006, and modified April 10, 2007, and the Division of Environmental Health, Public Water <br />Supply Section, ID #02-01-018, Serial #0501760, November 2, 2005. It is also important to <br />note that per this same agreement, the City of Mebane has been maintaining and servicing all <br />the infrastructure installed as part of the Buckhorn-Mebane Utilities Phase I project since it was <br />installed in 2007. <br />The transfer of facilities also include public on site water and sewer systems covered by <br />easements that serve the Gravelly Hill Middle School and Eurosport Soccer Center. These <br />facilities were certified by Mike Hammersley, PE, of Coulter Jewell Thames, PA. <br />
The URL can be used to link to this page
Your browser does not support the video tag.