Orange County NC Website
ORANGE COUNTY <br />BOARD OF COMMISSIONERS <br />ACTION AGENDA ITEM ABSTRACT <br />Meeting Date: December 5, 2011 <br />Action Agenda <br />Item No. r_ J- <br />SUBJECT: Formal Transfer of Ownership of Buckhorn-Mebane Water and Sewer Utilities <br />Phase I (also known as Gravelly Hill Middle School System) to the City of <br />Mebane <br />DEPARTMENT: Planning and Inspections PUBLIC HEARING: (Y/N) No <br />ATTACHMENT(S): <br />1. Engineer's Certification <br />a. Paul Thames, PE <br />b. Mike Hammersley, PE <br />2. Certificate of Completion of Water and <br />Sewer Improvements <br />3. Bill of Sale Transfer Document <br />4. Map/Survey showing assets <br />5.Original Easements <br />a. Water and Sewer <br />b. Lift Station <br />INFORMATION CONTACT: <br />Craig Benedict, 245-2585 <br />John Roberts, 245-2318 <br />Kevin Lindley, 245-2583 <br />PURPOSE: To transfer ownership of water and sewer facilities constructed by Orange County <br />and the property on which the Gravelly Hill Middle School pump station is built to the City of <br />Mebane. <br />BACKGROUND: Buckhorn-Mebane Utilities Phase I was installed by an Orange County <br />contractor and completed in 2007 to service Gravelly Hill Middle School and to a certain degree <br />other adjacent areas. Prior to this time (March 2004), Orange County and the City of Mebane <br />signed an interlocal utility service area agreement that set forth conditions of design, <br />construction, and project `close out'. The project `close out' includes state permit approvals for <br />usage, 'as builts', easement transfers, and formal transfer of ownership of installations including <br />water lines, fire hydrants, and gravity and force main sewer systems, as well as the sewage <br />pump station and associated property. Facilities include those noted in North Carolina <br />Department of Environment & Natural Resources (DENR) Permit #WQ00229683 issued March <br />31, 2006, and modified April 10, 2007, and the Division of Environmental Health, Public Water <br />Supply Section, ID #02-01-018, Serial #0501760, November 2, 2005. It is also important to <br />note that per this same agreement, the City of Mebane has been maintaining and servicing all <br />the infrastructure installed as part of the Buckhorn-Mebane Utilities Phase I project since it was <br />installed in 2007. <br />The transfer of facilities also include public on site water and sewer systems covered by <br />easements that serve the Gravelly Hill Middle School and Eurosport Soccer Center. These <br />facilities were certified by Mike Hammersley, PE, of Coulter Jewell Thames, PA. <br />