Browse
Search
Agenda - 11-01-2011 - 5j
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 11-01-2011
>
Agenda - 11-01-2011 - 5j
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2011 11:33:50 AM
Creation date
12/1/2011 11:33:46 AM
Metadata
Fields
Template:
BOCC
Date
11/1/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5j
Document Relationships
Minutes 11-01-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
View images
View plain text
19 <br />Town of Hillsborough Stormwater Management Program <br />Work Plan September 2010 <br />ANNUAL REPORTING AND EVALUATION <br />In order to help evaluate the effectiveness of the Town's NPDES Phase II stormwater <br />program, NCDWQ requires the submittal of an annual report. The annual report <br />submitted to NCDWQ is an online report that quantifies program elemer>fs completed in <br />the previous permit year. Additionally, Orange County stormwater staff will prepare a <br />narrative annual report containing the same information as submitted online, but with <br />details that include changes and updates to the stormwafer management plan. This <br />written annual report becomes a part of the Town's stormwater management program <br />and provides a summary of completed tasks and action items for the subsequent permit <br />year. The scope of this task wilt include the following components: <br />• Track necessary data for the annual report using the County's Permit Plus <br />database software, Good Housekeeping inspection database, and an Excel <br />spreadsheet based log. <br />• Asses progress toward each measurable goal to determine whether it was <br />completed. Determine effectiveness of each measurable goal .and make <br />mod cations for following year as warranted. Document goals not completed <br />and reason (i.e. lack of resources, staff time, etc.). <br />• Evaluate effectiveness of current tracking mechanisms and develop a <br />streamlined, central tracking system for all 6 components of the Town's <br />stormwater program. . <br />• Fill out and submit NCDWQs annual online report as required by the Town's <br />permit. <br />• Draft a narrative report concurrently and submit the Town, including presenting <br />the report to the Hillsborough Town Board. <br />• Update the Town's Stormwater Management Plan based on changes in <br />measurable goals and accomplishments. <br />IMPAIRED WATERS AND TMDL <br />Presently, no waters within the Town's jurisdiction are listed as impaired. Likewise, no <br />waters have been determined to contain a Total Maximum Daily Load (TMDL). However, <br />the Town's NPDES permit does contain requirements should a water within the Town's <br />jurisdiction become impaired or if a TMDL is developed for a given water body. The <br />tasks associated with these requirements are beyond the scope of this work plan. <br />Should these requirements become necessary, an updated work plan will be developed <br />and associated fees for these services determined. <br />,,.._. , -, ,.rte-. <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).