Browse
Search
Agenda - 11-01-2011 - 5h
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 11-01-2011
>
Agenda - 11-01-2011 - 5h
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2011 11:26:04 AM
Creation date
12/1/2011 11:25:56 AM
Metadata
Fields
Template:
BOCC
Date
11/1/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5h
Document Relationships
Minutes 11-01-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
47 <br />(~}} Permanent Nutrient Export Reduet%on Best ~ilanagement Practices <br />(1 ~ Al1o~.~~E~{e on-site structural stc~rmwater B~+1Ps for r~utrenf reduction shall include <br />11~~ l€sted in tine currenf l~~ ~~1Q Storwater best }~larta~ement Practices <br />~r'13rilk3l (~tt~Tl7w~tE'.r 1~14~1P lb~~rlual} Ur t~'ters apt;roved Cart ~ £; by e bc'i5i~_ <br />(2~ Design, maintenance and operation ol: ~tc~rmwater Bf-F's shall fc~llov standards <br />provided in the ~t~arm~vater B1~3P 1~1anu~r9_ <br />(3} l~e~viatirs frog these stand~Erds may allo~u~red as approved ors a case ley case <br />bass_ <br />~~~ ~ <br />r1 <br />~ <br />F c~g <br />~~ s <br />.a <br />E7~tl <br />a <br />at~ <br />~ <br />~ <br /> vcar <br />r <br />-v <br />~~~ (l~h nrc ~nnmaacsrF F~cr htf~i'lSAltl <br />(E} Total Nutrient Removal Fta~tes <br />Tc+tal nutridnt real rats of st+armwater 1~M1Ps artd BMf~s in a series wilf be credited <br />and calculated pursuant t0 the current edRton t3f the ".QE o~ ~~ ~iin~ nta~t~nrti rtf ldttnfcsr <br />ClE ralifir'~r C~rv 3ta~!a4~r €2nr!- ~!}~z~.~nmm~r~# CJmrtirric- AA~an~ Est t{#~t~,r 1~~R IYIt'~r~li~Jl~_ <br />Tai receive full nutrient reduction wit, design standards mint fv3lo~vthese autf~ned in <br />the ~tc~rmwater BMP lvlanual_ ~~,~ l.~eviations from ~e design standards maybe <br />allowed as approved on a case by case basis. <br />6,14.8 Peak Ranoff Volume <br />(A} ~tandarsl <br />1=ar al new deveiop~nent, th~:re shalt #~ no net increase in peak flcr~e ieaving the site from <br />the predevelopment conditions ft~r the 1 year, 24 hour storm_ <br />{l~} <br />
The URL can be used to link to this page
Your browser does not support the video tag.