Orange County NC Website
16 <br /> <br />• 24/72 PL (Peak Load) <br />- Hybrid of Current Model <br />-Allows Staffing When/Where Needed <br />-Allows Staff Recovery <br />-Allows Appropriate Supervision <br />- Up to 2 More Units Without Added Cost <br />-Could Reduce OT Costs <br />11 <br />