Browse
Search
Agenda - 11-15-2011 - 8a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 11-15-2011
>
Agenda - 11-15-2011 - 8a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2012 4:16:27 PM
Creation date
11/30/2011 12:39:44 PM
Metadata
Fields
Template:
BOCC
Date
11/15/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8a
Document Relationships
Minutes 11-15-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t�ttn ch men a <br />Board of Education <br />Agenda Abstract <br />Meeting Date: <br />Agenda Type: <br />Agenda Item #: <br />11/03/11 <br />Subject: Recommendation to approve a fund balance appropriation to accelerate the <br />construction of Elementary School #11 <br />Division: <br />Support Services Division, <br />Department: <br />Facilities <br />Todd LoFrese <br />Management <br />Person <br />William J. Mullin, Executive Director <br />Feedback <br />Responsible: <br />of School Facilities <br />Requested <br />From: <br />Public Hearing Required: No <br />Previous Work Session: No Date <br />Previous Discussion and Action: No Date <br />Attachment(s): Calendar of Actions and needed cash flow to start construction of Elementary <br />School #11 in March 2012. <br />PURPOSE: To update the Board on the Elementary #11 project and seek approval of an <br />acceleration plan to construct the school to open in 2013 -14. <br />BACKGROUND: <br />Elementary School #11 will be built in the Northside community between Caldwell and <br />McMasters Streets. The design is a multi story building to accommodate 585 students. <br />Elementary #11 will be built to LEED gold specifications. <br />Based on current student enrollment, it is projected that Elementary School #11 will be needed in <br />2012 -13 to meet the requirements of Orange County's Schools Adequate Public Facilities <br />Ordinance (SAPFO) and to help alleviate major overcrowding concerns. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.