Orange County NC Website
66 <br />NETL F 451.1-1/3 <br />(1U2007) OPI=320 <br />(Page 12) U.S. DEPARTMENT QF ENERGY <br />ENVIRONMENTAL QUESTIONNA.IlZE <br />I!V. CERTIFICATION BY PROPOSER <br />I hereby certify that the information provided herein is current, accurate, and complete as of the date shown immediately <br />below. <br />~_..~_._~.M.. r._.,..........~. ~ ,~,~., <br />SIGNATURE: ~ _ ...'...._ .......... DATE (mm/dd/yyyy); <br />TYPED NAME: <br />TITLE: <br />ORGANIZATION: <br />V. REVIEW AND APPROVAL BY DOE <br />I hereby certify that I have reviewed the information provided in this questionnaire, have determined that all questions have <br />been appropriately answered, and judge the responses to be consistent with the efforts proposed. Based on the information in <br />the questionnaire, I conclude the following (check the appropriate box}: <br />^ The proposed action falls under one or more of the categorical exclusions (CXes) listed in Appendix A or 13 of <br />Subpart D of the DOE NEPA Implementing Procedures and would not (I) violate applicable ES&H requirements, <br />(2) require siting of waste transportation, storage and disposal or recovery facilities, (3) disturb hazardous materials <br />(excluding naturally occurring petroleum and natural gas), thus producing uncontrolled or unpermitted releases, and <br />(4) adversely affect environmentally sensitive resources. <br />Additionally, the proposed action (1) would not present any extraordinary circumstances such that the action might <br />have a significant impact upon the human environment, (2) is not connected to other actions with potentially <br />significant impacts, and (3) is not related to other actions with cumulatively significant unpacts. <br />Based on the Environmental Questionnaire and these conclusions, Categorical Exclusion of the proposed action <br />would be appropriate. <br />^ The.proposed action does not qualify as a CX as identified in Subpart D of DOE's NEPA Implementing Procedures; <br />therefore, the proposed action may require further documentation in the form of an Environmental Assessment of <br />Environmental Impact Statement. <br />PROJECT MANAGER <br />SIGNATURE: _.__.. __ DATE (mmldd/yyyy): <br />TYPED NAME: <br />12 <br />