Orange County NC Website
65 <br />NETL F 451.1-1/3 <br />(11/200'n OPI=320 <br />(Page 1]) U.S. DEPARTMENT OF ENERGY <br />ENVIRONMENTAL QUESTIONNAIRE <br />d. Clean Water Act (CWA): ^ None ^ Required (describe) <br />e. Underground Storage Tank Control Program ST : ^ None ^ Required (describe) <br />f. Underground Injection Control Program IC : ^ None ^ Required (describe) <br />g. Clean Air Act (CAA): ^ None ^ Required (describe) <br />h. Endangered Species Act (ESA): ^ None ^ Required (describe) <br />i. Floodnlains and Wetlands Regulations: ^ None ^ Required (describe) <br />j. Fish and Wildlife Coordination Act (FWCA): ^ None ^ Required (describe) <br />k. National Historic Preservation Act (NHPA): ^ None ^ Required (describe) <br />I. Coastal Zone Management Act (CZMA): ^ None ^ Required (describe) <br />2. Identify any other environmental laws and regulations (Federal, state, and local) for which compliance would be <br />necessary for this project, and describe the permits, manifests, and contacts that would be required. <br />F. DESCRIBE ANY ISSUES THAT WOULD GENERATE PUBLIC CONTROVERSY REGARDING THE <br />PROPOSED PROJECT. ^ None <br />G. WOULD THE PROPOSED PROJECT PRODUCE ADDTTIONAL DEVELOPMENT, OR ARE OTHER <br />MAJOR DEVELOPMENTS PLANNED OR UNDERWAY, IN THE PROJECT AREA? <br />^ No ^ Yes (describe) <br />H. SUMMARI7.E THE SIGNIFICANT IMPACTS THAT WOULD RESULT FROM THE PROPOSED <br />PROJECT. ^ None (provide supporting detail) ^ Significant impacts (describe) <br />