Browse
Search
Agenda - 11-15-2011 - 5i
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 11-15-2011
>
Agenda - 11-15-2011 - 5i
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2011 12:25:18 PM
Creation date
11/30/2011 12:19:17 PM
Metadata
Fields
Template:
BOCC
Date
11/15/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5i
Document Relationships
2011-356 County Manager - Triangle J Council of Governments for Electric Vehicle Charging Stations
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2011
Minutes 11-15-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
ORD-2011-040 Budget Amendment #4-A
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
62 <br />NEIL F 451.1-1/3 <br />(11l200~ OPI=320 <br />(Page 8) U.S. DEPARTMENT OF ENERGY <br />ENVIIZONMENTAL QUESTIONNAIlZE <br />d. What would be the major components of each type of wastewater (e.g., coal fines)? ^ No wastewater produced <br />e. Identify the local treatment facility that would receive wastewater from the proposed project. <br />^ No dischazges to local treatment facility <br />f. Describe how wastewater would be collected and treated. <br />g. Would any run-off or leachates be produced from storage piles or waste disposal sites? ^ No ^ Yes (describe source) <br />h. Would project require issuance of new or modified water permits to perform project work or site development <br />activities? ^ No ^ Yes (describe) <br />Where would wastewater effluents from the proposed project be discharged? ^ No wastewater produced <br />j. Would the proposed project be permitted to discharge effluents into an existing body of water? <br />^ No ^ Yes (describe water use and effluent impact) <br />k. Would a new or modified National Pollutant Discharge Elimination System (NPDES) permit be required? <br />^ No [] Yes (describe) <br />1. Would the proposed project adversely affect the quality or movement of groundwater? ^ No ^ Yes (describe) <br />m. Would the proposed project require issuance of an Underground Infection Control (LTIC) permit? <br />^ No ^ Yes (describe) <br />8. Solid and Hazardous Wastes <br />a Identify and estimate major non-hazardous solid wastes that would be generated from the project. Solid wastes aze <br />defined as any solid, liquid, semi-solid, or contained gaseous material that is discarded or has served its intended <br />purpose, or is a manufacturing or mining by-product (See EPA Municipal Solid Waste and Municipal Solid by Statel. <br />~ U Municipal solid waste, i.e., paper, plastic, etc. ~ ~ <br />U Coal or coal <br />^ Other --Idea <br />n None <br />g <br />
The URL can be used to link to this page
Your browser does not support the video tag.