Orange County NC Website
58 <br />NEIL F 451.1-1/3 <br />(11/200'n OPI=320 <br />(Page 4) U.S. DEPARTMENT OF ENERGY <br />ENVIRONMENTAL QUESTIONNAIRE <br />c. Describe planned construction, installation, and/or demolition activities, i.e., roads, utilities system right-of--ways, <br />parking lots, buildings, laboratories, storage tanks, fueling facilities, underground wells, pipelines, or other structures. <br />^ No construction would be anticipated for this project. <br />d. Describe how land use would be affected by operational activities associated with the proposed project. <br />^ No land areas would be affected. <br />e. Describe any plans to reclaim areas that would be affected by the proposed project. <br />^ No land areas would be affected. <br />f. Would the proposed project affect any unique or unusual landforms (e.g., cliffs, waterfalls, etc.)? <br />^ No ^ Yes (describe) <br />g. Would the proposed project be located in or near local, state, or federal parks; forests; monuments; scenic waterways; <br />wilderness; recreation facilities; or tribal lands? ^ No ^ Yes (describe) <br />If project work activities falls under item A-7b; then proceed directly to question D.6 (Atmospheric Conditions/Air <br />Quality) and continue to frll out questionnaire.. <br />If project work falls under item A-7c.; then proceed directly below to question D.2 (Construction flctivities and/or <br />O rations and continue to 11 out uestionnaire. <br />2. Construction Activifies and/or Operation <br />a. Identify project structure(s), power line(s), pipeline(s), utilities system(s), right-of-way(s) or road(s) that will be <br />constructed and cleazly mazk them on a project site map or topographic map as appropriate. [] None <br />b. Would the proposed project require the construction of waste pits or settling ponds? <br />^ No ^ Yes (describe and identify location, and estimate surface area disturbed) <br />c. Would the proposed project affect any existing body of water? ^ No ^ Yes (describe) <br />d. Would the proposed project impact a floodplain or wetland? ^ No ^ Yes (describe) <br />e. Would the proposed project cause runoff/sedimentation/erosion? ^ No ^ Yes (describe) <br /> <br />