Orange County NC Website
~7~c~~~-r' ~-~ 5 5 <br />NEIL F 451.1-1/3 <br />(11/2007) OPI=320 <br />(Previous Editions obsolete) U.S. DEPARTMENT OF ENERGY <br />ENVIRONMENTAL QUESTIONNAIRE <br />BACKGROUND <br />The Department of Energy (DOE) National Environmental Policy Act (NEPA) Implementing Procedures (10 CFR 1021) <br />require careful consideration of the potential environmental consequences of all proposed actions during the early planning <br />stages of a project or activity. DOE policy directs at the earliest possible stage in a project whether such actions will require <br />preparation of an Environmental Assessment, an Environmental Impact Statement, or a Categorical Exclusion. To comply <br />with these requirements, an Environmental Questionnaire (NETL Form 451.1-1/3) must be completed for each proposed <br />action to provide DOE with the information necessary to determine the appropriate level of NEPA review and <br />documentation. If the proposed project qualifies for Categorical Exclusion designation, a Categorical Exclusion Designation <br />Form (NEIL Form 451.1-1/1) will also be completed in addition to the Environmental Questionnaire. <br />II. INSTRUCTIONS <br />Separate copies of the Environmental Questionnaire and Categorical Exclusion Designation Form (if required) should be <br />completed by the principal proposer and principal subcontractor(s). In addition, if the proposed project includes activities at <br />different locations, an independent questionnaire should be prepared for each location. Supporting information can be <br />provided as attachments. <br />In completing this Questionnaire, the proposer is requested to provide specific information and quantities, when applicable, <br />regarding air emissions, wastewater discharges, solid wastes, etc., to facilitate the necessary review. The proposer should <br />identify the location of the project and specifically describe the activities that would occur at that location. In addition, the <br />proposer will be required to submit an official copy of the project's statement of work (SOW) or statement of project <br />objective (SOPO) that will be used in the contract/agreement between the proposer and DOE. <br />III. QUESTIONNAIRE <br />A. PROJECT SUMMARY <br />1. Solicitation/Project Number: <br />2. Proposer and Subcontractor(s): <br />3. Principallnvestigator: <br />Telephone Number: <br />4. Project Title: <br />5. Duration: <br />6. Location(s) of Performance (Ciry/Township, County, State): <br />7. Identify and select the checkbox with the predominant project work activities under Group A-7a, A-7b, or A-7c. <br />Group A-7a <br />Categorical Exclusion CX-A: Routine administrative, procurement, training, and personnel actions. Contract <br />activities/awardsfnr management support, fmancial assistance, and technical services in support of agency business, <br />programs, projects, and goals. Literature searches and information gathering, material inventories, property surveys; <br />data analysis, computer modeling, analytical reviews, technical summary, conceptual design, feasibility studies, <br />document preparation, data dissemination, and paper studies. Technical assistance including financial planning, <br />assistance, classroom training, public meetings, management training, survey participation, academic contribution, <br />technical consultation, and stakeholders surveys. Workshop and conference planning, preparation, and <br />implementation which may involve promoting energy efficiency, renewable energy, and energy conservation. <br />