Browse
Search
Agenda - 10-18-2011 - 5i
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 10-18-2011
>
Agenda - 10-18-2011 - 5i
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2011 10:59:18 AM
Creation date
11/29/2011 10:59:17 AM
Metadata
Fields
Template:
BOCC
Date
10/18/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5i
Document Relationships
Minutes 10-18-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
RES-2011-090 Resolution Amending the Resolution Establishing Rules and Regulations for the Operation of a Sewer Collection Treatment System to Serve the Efland Area of Orange County
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2010-2019\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~+~,,,~..~- a <br />02224 <br />CITY OF MEBANE POLICY STATEMENT CONTINUED <br />SUBJECT: EFFECTIVE DATE: Page 3 of 4 NO. <br />WATER AND SEWER October 1, 2005 <br />TAPPAGE FEES AND <br />CONNECTION FEES <br />Notes• <br />A. Any item not included in the above schedule shall be referred to the Public Works Director for a <br />specific price determination. <br />B. The City retains ownership of all meters, meter boxes, vaults, etc. <br />C. The City shall install all meters. <br />D. Pressure sewer taps and pressure sewer pumps shall be made by the property owner according to <br />City standards. <br />E. Should road bores or pavement cuts be required fora 3/a" water or 4" sewer tap, add $500.00 to <br />the above tappage fees. <br />F. The above fees are payable at the time of application for service and are for the service to be <br />installed. <br />~~ Water and Sewer Connection Fees <br />As previously stated, water and sewer connection fees are payable in addition to water and sewer tappage <br />fees. Connection fees are not applicable to those areas where prior impact fees have previously been <br />paid. Connection fees are applicable to property inside and outside the Corporate Limits. <br />The following schedule shows fees charged by the City for Water and Sewer Connection Fees. The fees <br />are subject to change on an annual basis as established by the City Council. The connection fees are <br />based on the type of customer and/or the size of tap. <br />WATER AND SEWER CONNECTION FEE SCHEDULE <br />A. Water and Sewer Connection Fees <br />Item Water Water Connection Sewer Connection <br />No. Customer T e Meter Size Fee Fee <br />1. Sin a Family Dwell' Unit 3/," $ 1,000.00 $ 1,300.00 <br />2. Sin a Famil Dwellin Unit 1" $ 1,400.00 $ 1,800.00 <br />3. Single Family Dwelling Unit > 1" Use Fee Under <br />Other Zoning <br />Cate cries Use Fee Under <br />Other Zoning <br />Cate cries <br />4. Multi-Famil Dwellin Unit . N/A $1 000.00 er unit $1,300.00 er unit <br />5. All Other Zonin Cate cries 3/a" $ 1,200.00 $ 1 600.00 <br />Sa. 1" $ 2,000.00 $ 2,600.00 <br />Sb. 1.5" $ 4,000.00 $ 5,200.00 <br />Sc. 2" $ 7,500.00 $ 10,000.00 <br />Sd. 3" $ 15 500.00 $ 20,000.00 <br />Se. 4" $ 24,000.00 $ 31,000.00 <br />Sf. 6" $ 38,000.00 $ 45,000.00 <br />5g ~, , 8" $ 75,000.00 $ 97,000.00 <br />5h. 10" $117,000.00 $152,000.00 <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.