Browse
Search
Agenda - 10-13-2011 - 1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 10-13-2011
>
Agenda - 10-13-2011 - 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2011 10:35:35 AM
Creation date
11/29/2011 10:35:34 AM
Metadata
Fields
Template:
BOCC
Date
10/13/2011
Meeting Type
Municipalities
Document Type
Agenda
Agenda Item
1
Document Relationships
Minutes 10-13-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Space to accommodate the necessary setbacks, road. <br /> ex ansions and other site amenities. <br />1 2 3 Access <br /> • Accessibility for pedestrians <br /> • Accessibility for vehicles <br /> • Accessibilit for ublic trans ortation <br /> Total: Phase 1 <br /> (If total ranking equals 6 or more, excluding a ranking of <br /> one 1 o to Phase II <br /> <br />Low Med Hi h Phase II <br />1 2 3 Centrality <br /> • Existing population <br /> • Growth and deveiopment <br /> • Proximity to schools <br /> • Proximity to -retaii <br /> • Proximity to other libraries <br /> • Site is not isolated <br />1 2 3_ Site Conditions, Allowances, and Constraints <br /> • The cost-benefit conclusions of physical, legal, and <br /> entitlement site allowances/constraints <br /> • Technical and environmental assessments <br /> (planning/zoning, jurisdictional processes, etc.) <br /> • Environmentally sustainable (C&A, storm water mgt, <br /> buffers, energy "net zero" capaci#y) <br /> • .Operationally sustainable <br /> • Defeats obsolescence <br />1 2 3 Cost and Availability <br /> • Cost for site acquisition <br /> • Timeframe for development of the site <br /> • Terms for site control necessary for development <br /> rocess . <br /> Total: Phase II <br /> (if the total ranking equals ~ or more, excluding, a ranking <br /> of one 1 , o to Phase III <br />Low Med Hi h Phase III <br />1 2 3 Community Preference <br /> • Input from elected officials <br /> • Alignment with planning tools (Comprehensive Plan) <br /> • Input from a board cross-section of the area to be <br /> served <br /> • Orange County Library Advisory Board <br /> • Orange County & Carrboro Friends of the Library <br />
The URL can be used to link to this page
Your browser does not support the video tag.