Orange County NC Website
I. Erosion repair unit cost $157 <br />Total Erosion Repair Cost Per <br />m. Year (I x m) <br />Total Maintenance and Repairs <br />n. Cost Per Year (d + f + /+k+n) <br />Annual Post-Closure Cost_ <br />(APCC) <br />Length of Post-Closure Care Period <br />Post Closure Cost Estimate Subtotal <br />APCC x Length <br />of period <br />Contingencies (10%) Subtotal x 0__7 <br />Engineering Fees = <br />Post-Closure Certification (5% or as needed) <br />Total Post-Closure Cost = (2011 Dollars) <br />Subtotaa + Contingencies +~Engineering <br />Orange County Eubanks Road CD Landfill <br />July 6, 2011 9 <br />Assumed <br />18"depth <br />90 <br />$157 /acro <br />$12 /year <br />2 764 /yr <br />2 764 <br />30 <br />$82,929 <br />$8,293 <br />$4,146 <br />$95,369 <br />Post-Closure Costs <br />