Orange County NC Website
TOTAL CONSTRUCTION CLOSURE <br />COSTS <br />Subtotal Closure Costs = <br />(I+l/, , . XVlll) 743 966 <br />Continqencv (10% <br />(Subtotal x 0.1) 74 3R7 <br />Engineering Fees = <br />Construction Documents (5% or as <br />needed) (Subtotal x 0.05) 37-~gg <br />Construction Quality Assurance (10% or as <br />needed) (Subtotal x 0.10)- 74 397 <br />Total Closure Cost (2011 Dollars) _ ''~~~-~ <br />~_, 929 957 <br />(Subtotal +Contingency + Engineering) <br />88 <br />Orange County Eubanks Road CD Landfill <br />July 6, 2011 7 Closure Costs <br />