Orange County NC Website
87 <br />XlV. GROUNDWATER MONITORING SYSTEM <br />(SYSTEM ALREADY INSTALLEDI <br />a. Hydrogeologic study unit cost (includes <br />boring costs, piezometer costs, pump test <br />costs, etc.) <br />b. Monitoring well construction unit cost <br />(includes installation and materials fora 50' <br />deep well; minimum of four wells must be <br />installed) <br />c. Numberof wells to be installed <br />d. Additional well length over 50' <br />e. Unit cost for additional well length over 50' <br />f. Total additional cost for well length over 50' <br />g. Total Monitoring Well Construction most <br />h. Total Groundwater Monitoring System- Cosf <br />)(-/ MOBILIZATIONI DEMOBILIZATION <br />a. Cost for Mobilization/ DemobilizatTon- <br />~//, SURVEY AND DEED NOTATION <br />a. Cost for Survey and Deed Notation <br />~///, CLOSURE CERTIFICATION <br />a. Closure Cert~cation Costs <br />~//. MISCELLANEOUS COSTS TO CLOSE <br />a. Erosion Control <br />b. Storm Water Control <br />c. Total Miscellaneous Costs <br />Orange County Eubanks Road CD Landfll <br />July 6, 2011 6 <br />$1-0,000 or as required <br />$1,236.77 .~ <br />0 <br />0 <br />$1,236.77 per well <br />0 wells <br />0 LF <br />I~ $27.25 ~1 <br />(e x d) <br />(b x c)_ <br />(b x c) + (d x e) <br />$27:25 per VLF <br />$O.DO <br />$0.00 <br />0.00. <br />$15, 000 or as required ~ 35 774 <br />$2, 000 or as required - 7 666 <br />$2, 000 or as required 2 0~ <br />$15,000 or-as required $15,332 <br />$5,000 or as required_ $5,111 <br />(a + b) 20 442 - <br />Closure Costs <br />