Browse
Search
Agenda - 10-04-2011 - 8a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 10-04-2011
>
Agenda - 10-04-2011 - 8a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2011 2:56:01 PM
Creation date
11/28/2011 2:55:47 PM
Metadata
Fields
Template:
BOCC
Date
10/4/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8a
Document Relationships
Minutes 10-04-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
74 <br />c. Total Well Construction and Reporting $21, 000.00 for 1 year <br />III. HRC Injection and Groundwater Monitoring <br />a. Engineering services $3,Ofl0.00 <br />b. HRC Compound ($0.52 perpouna, withl0% m/u, + shipping} $132.00 per year <br />c. Sampling fees -injection byproducts (assumes i hr perwen - s wens) $440.00 <br /> Laboratory fees -injection byproducts (assumes s samples at $ass each <br />d. (incllo°~°m/n) $1,415.00 <br />e. Subtotal Monitoring and Reporting $4,855.00 per event <br />f. Total Monitoring and Reporting for 1 Year- (2 events) $9,710.G0 per year <br />g. Total Monitoring acrd Reporting ((b x S) + (f x S)) $49, 210.00 for S years <br />IV. Direct Oxidation and Groundwater Monitoring <br />a. Engineering services $3,000.00 <br />b. Direct Oxidation Compound (szss per s-lb bucket, with to°i° ~„> $313.00 <br />c. Sampling fees -injection byproducts (assumes > hr per welt - 6 webs) $530.00 <br />Laboratory fees -injection byproducts (assumes 6 samples at $162 each <br />d. (incl io°i° mru}- $972.00 <br />e. Subtotal Monitoring and Reporting $4,815.00 per event <br />e. Total Monitoring and Reporting for 1 Year (2 events) $9,630.00 per year <br />f. Total M©nitoring and Reporting ((b x S) + (e z~S)) $48,150.00 for S years <br />IV. Hydrogeologic Control <br />a. Engineering services $15,000.00 <br />b. Well construction (assume 4 additional wells) $40,000.00 <br />c. Pumps and accessories (5 wells) $15,000.00 <br />d. Install power supply to all 5 wells $200,000.00 <br />d. Sampling fees $0.00 <br />e. Laboratory fees $0.00 <br />f. Subtotal Well Construction-and Reporting $270,000.00 implementation <br />g. Operations and Maintenance $15,000.00 per year <br />h. Total for Hydrogeologic Control (f + (gx5)) $330, 000.00 for 4 years <br />City Cost Index 100.0 <br />Contingencies @ 10% $51 854 <br />Corrective Action Costs, 2009 dollars $570,394 [for 17 years} <br />Net adjustment for 2009 to 2011 inflation 1.022 <br />2010 = 1.2% [per DENR July 28, 2010] <br />2011 = 1.0% [per DENR January 1, 2011] <br />Adjusted Post-Closure Costs, 2011 dollars $583,011 <br />North Side -Page 8 08/23/2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.