Browse
Search
Agenda - 10-04-2011 - 8a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 10-04-2011
>
Agenda - 10-04-2011 - 8a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2011 2:56:01 PM
Creation date
11/28/2011 2:55:47 PM
Metadata
Fields
Template:
BOCC
Date
10/4/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8a
Document Relationships
Minutes 10-04-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
72 <br />c. Gas monitoring unit cost $254.00 per round <br />d. Total Gas Monitoring Cost $1, 016.00 per year <br />III. Leachate Management <br />a. Private disposal unit cost $0.11 per gallon <br />b. POTW disposal unit cost $0.03 per gallon <br />c. Direct discharge to POTW unit cost $0.03 per gallon <br />d. Amount of Leachate generated 0 gallons/year <br />e. Loading/unloading time unit cost $116.75 per 5000 gal. trk <br />f. Number of trucks 0 per year <br />g. T-atal cost for loading/unloading 0 <br /> Number of miles over 5 mile haul distance 0 miles <br />h. Additional cost for haul distance $0.00 per truck <br />i. Total cost for loading/unloading $0.00 <br />j. Total Leachate cost, private disposal $0.00 per-year <br />k. Total Leachate cost, POTW disposal $0.00 per-year <br />1. Total Leachate cost, direct discharge $0.00- per year <br />m. Total Leachate Management Cost $0.00 per year <br />IV. Routine Maintenance and Repairs <br />a. Mowing frequency 1 per year <br />b. Area involved in maintenance and repairs 50 acres <br />c. Mowing unit cost per visit $15.22 per acre per visit <br />d. Total mowing cost -$761.00 per year <br />e. Fertilizer unit cost $508.00 per acre <br />f. Total fertilizer cost per year $1;016.00 per year <br />g. Reseeding/Mulch unit cost $710.00 per acre- <br />h. Total Reseeding/Mulch cost $1,420.00 per year <br />i. Mobilization/demobilization cost per year $102.00 per year <br />j. Total Maintenance and Repairs Cost Per Year $3,299.00 per year <br />V. Vector and Rodent Control <br />a. Total Vector and Rodent Control Costs $1, 015.00 per year <br />VI. GCCS System <br />a. Conversion of 36 gas vents to active extraction wells $0.00 lump sum <br />-(Work completed in 2.011) <br />b. GCCS Maintenance $912,000.00 lump sum <br />c. Decommission of LFG extraction wells $10,800.00 lump sum <br />d. Total GCCS System $922,800.00 lump sum <br />City Cost Index 100.0 <br />North Side -Page 6 08/23/2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.