Browse
Search
Agenda - 10-04-2011 - 8a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 10-04-2011
>
Agenda - 10-04-2011 - 8a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2011 2:56:01 PM
Creation date
11/28/2011 2:55:47 PM
Metadata
Fields
Template:
BOCC
Date
10/4/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8a
Document Relationships
Minutes 10-04-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
71 <br />f. Landfill gas monitoring probe unit cost $43.52 per linear foot <br />g. Total landfill gas control vent cost $"0.00 <br />h. Total landfill gas monitoring probe cost $0.00 <br />i. Total Landfill Gas Management System Cost $0.00 <br />XIV. Groundwater Monitoring System <br />a. Hydrogeologic study unit cost $0.00 <br />b. Monitoring well construction unit cost $1,333.00 per well <br />c. Unit cost for additional well length over 50' $23:94 per foot <br />Number of wel-ls 0 <br />Additional feet over 50' 0 <br />d. Total monitoring well cost $0:00 <br />e. Total Groundwater Monitoring Cost X0.00 <br />XV. Mobilization & Demobilization <br />a. Cost for Mobilization Demobilization $0 <br />XVI. Surveyand Deed Notation <br />a. Cost for Survey and Deed Notation $0 <br />XVIL Closure Certification <br />a. Closure Certification Costs $0 <br />City Cost Index (CCIJ 100.0 <br />Adjusted Total Costs $p <br />Total, Closure Cost Estimate $Q <br />Post Closure Costs - 2000 dollars <br />Remaining Post-Closure Period 17 years <br />I. Groundwater Monitoring Costs <br />a. Total number of monitoring wells 12 <br />b. Total number of samples per year 2 <br />c. Assessment unit monitoring costs $1,200.00 per sample <br />d. Total assessment monitoring costs $28,800.00 per year <br />e. Total Groundwater Monitoring Cost $489, 600.00 <br />II. Gas Monitoring <br />a. Frequency of testing 4 rounds per year <br />b. Number of gas probes installed 19 each <br />North Side -Page 5 08/23/2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.