Browse
Search
Agenda - 10-04-2011 - 8a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 10-04-2011
>
Agenda - 10-04-2011 - 8a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2011 2:56:01 PM
Creation date
11/28/2011 2:55:47 PM
Metadata
Fields
Template:
BOCC
Date
10/4/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8a
Document Relationships
Minutes 10-04-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~o <br />VIII.- Geotextile Filter Fabric <br />a. Quantity of filter fabric needed 0 square yards <br />b. Purchase unit cost ~ $0.71 per square yard <br />c. Delivery unit cost $0.06 per square yard <br />d. Installation unit cost $0.49 per square yard <br />e. Total geotextile filter fabric unit cost $1.26 per square yard <br />f. Total Geotextile Fil-ter Fabric Cost $0.00 <br />IX. Soil Admixture <br />a. Area to be capped 0 acres <br />b. Soil admixture unit cost $7.34 per square yard <br />c. Total Soil Admixture Cost $0.00 <br />X. Native Soil for Cover <br />a. Area to be capped 0 acres <br />b. Depth of soil needed 24 inches <br />c. Quantity of soil needed 0 cubic yards <br />d. Excavation unit cost $1.36- per cubic yard <br />e. Placement and spreading unit cost $0.54-per cubic yard <br />f. Compaction unit cost $0.00 per cubic yard <br />g. Total native soil unit cost $1.90 per cubic yard <br />h. Delivery unit cost $0.00 per cubic yard <br />i. Deliver cost $0.00 <br />j. Percent compaction 25% <br />k. .Total Native Soil Cost $0.00 <br />XI. Soil Testing <br />a. Number of acres to be capped 0 acres <br />b. Testing unit cost $174.00 per acre <br />c. Total Soil Testing Cost $0.00 <br />XII. Vegetative Cover <br />a. Number of acres to be vegetated 0 acres <br />b. Unit cost for soil preparation, grading, seed, and fertilizer $2,176.00 per acre <br />c. Total Vegetative Cover Cost $0.00 <br />XIII. Gas Management System <br />a. Number of acres of landfill to be closed 0 acres <br />b. Number of landfill gas monitoring probes to be installed 0 each <br />c. Number of landfill gas vents to be installed 0 each <br />d. Length of landfill gas vents 0 linear feet <br />e. Landfill gas control vent unit cost $1,088.00 per vent <br />North Side -Page 4 08/23/2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.